7
6
8
4
Remove and discard Plastic Cap from end of Pullout Hose (I) ,
install Pullout Hose
(I)
to Outlet Hose. Push in as far as possible
until a “click” is heard.
Note: To release the installation, you can
press the switch and pull down at the same time.
Check that hot & cold supply hoses are connected correctly to hot
& cold supplies. Option: If applicable, Adapters
(J)
can be used to
accomodate 1/2’’ shut off valves.
Insert Pullout Hose
(I)
into opening and feed through Faucet Body
(B)
until wand is docked
Note: Do not remove the Plastic Cap of
Pullout Hose (I) first during installation.
Install Hose Weight
(M)
between bottom of loop curvature and
white tape of Pullout Hose
(I)
.
Note:The installation of Hose
Weight must ensure that the pull-out function works well.
5
Hot
Cold
Install zone
Or
I
B
H
B
M
Plastic Cap
Outlet Hose
I
I
Option
J