
Operation
62
06/99 AWB 2700-1364 GB
PC
→
→
→
→
PLC
To transfer programs from the PC to the PLC,
the PS 4-271 must be in the “Ready” or “Not Ready”
state although the mode selector switch on the
control panel can be in any position.
왘
Transfer the program to the PLC (see Chapter 8
of the “Sucosoft S 40 user interface” manual,
AWB 2700-1305-GB).
If the mode selector switch is in the “Halt” position,
the “Ready” and “Not Ready” LEDs light during
transfer of the program. This indicates that the data
transfer between the PS 4-271 and the PC is being
performed correctly.
PC
→
→
→
→
memory module
왘
Switch off the PLC and plug in the memory
module.
왘
Switch on the PLC again. The PLC must be in the
“Ready” or “Not Ready” state.
왘
Transfer the program from the PC to the memory
module (see Chapter 8 of the “Sucosoft S 40 user
interface“, (AWB 2700-1305-GB).
The section "Programming via Suconet K" on
Page 63 deals with the transfer of the program to
the PLC via Suconet K.
For Immediate Delivery call KMParts.com at (866) 595-9616