3/3
09/05 AW
A
1230
-1917
Moeller GmbH, Industrieautomation, D-53105 Bonn
© 2002 by Moeller GmbH
Änderungen
vorbehalten
09/05 AWA1230-1917 10045192/DE08
Doku/DM
Printed in the Federal Republic of Germany (10/05)
-NA, -CNA
(UL/CSA models)
NZM2(-4)-XKS
Removal of XKC Pressure clamp connectors to re-install
XKS Screw terminations.
Removal of XKC pressure clamp connector kits will enable re-installation of XKS screw
termination connectors.
Follow diagrams in this instruction sheet in reverse order to remove the XKC pressure clamp
connectors and proceed as shown above to re-install XKS screw terminations.
-NA, -CNA
(UL/CSA models)
11
ON
Z 2
1.
3
Nm, 11.5 lb-
i
n
12
push
It is necessary to re-install
the barrier to maintain
proper electrical clearances!
ON
3
1
2
5 mm
14 Nm, 124 lb-
i
n
13a
XKC
a
XKS
5 mm
14 Nm, 124 lb-
i
n
a
2
x
a
> 20 mm
a
13b
13c
ON
Z 2
1.
3
Nm, 11.5 lb-
i
n
13d
push
It is necessary to re-install
the barrier to maintain
proper electrical clearances!