background image

3/3

09/05 AW

A

1230

-1917

Moeller GmbH, Industrieautomation, D-53105 Bonn
© 2002  by Moeller GmbH

Änderungen
vorbehalten

09/05 AWA1230-1917 10045192/DE08

Doku/DM

Printed in the Federal Republic of Germany (10/05)

 

 

-NA, -CNA

(UL/CSA models)

NZM2(-4)-XKS

Removal of XKC Pressure clamp connectors to re-install
XKS Screw terminations.

Removal of XKC pressure clamp connector kits will enable re-installation of XKS screw
termination connectors.
Follow diagrams in this instruction sheet in reverse order to remove the XKC pressure clamp
connectors and proceed as shown above to re-install XKS screw terminations.

 

 

-NA, -CNA

(UL/CSA models)

11

ON

Z 2

1.

3

 Nm,  11.5 lb-

i

n

12

push

It is necessary to re-install
the barrier to maintain
proper electrical clearances!

ON

3

1

2

5 mm
14 Nm,  124 lb-

i

n

13a

XKC 

a

 XKS

5 mm
14 Nm,  124 lb-

i

n

a

x

a

 > 20 mm

a

13b

13c

ON

Z 2

1.

3

 Nm,  11.5 lb-

i

n

13d

push

It is necessary to re-install
the barrier to maintain
proper electrical clearances!

Отзывы: