![Moeller AWB2700-1426GB Скачать руководство пользователя страница 49](http://html1.mh-extra.com/html/moeller/awb2700-1426gb/awb2700-1426gb_manual_1819288049.webp)
Mechanical Mounting
45
11/01 AWB2700-1426GB
3
Mounting rails
To mount XStart, a second mounting rail is required to be
mounted at a concentric distance of 125 mm / 4.92 inch
below the mounting rail for the XI/ON station. Both moun-
ting rails should be mounted on the same mounting plate.
Dimension drawings
Figure 29: Side view of XStart module (complete with base
module)
h
Please observe the notes about the correct mounting and
grounding in chapters 6 and 7 of the manual
„XI/ON PROFIBUS-DP".
h
All dimensions are shown in mm.
128
300
95
80
125
For Immediate Delivery call KMParts.com at (866) 595-9616
Содержание AWB2700-1426GB
Страница 8: ...11 01 AWB2700 1426GB 4 For Immediate Delivery call KMParts com at 866 595 9616...
Страница 12: ...8 11 01 AWB2700 1426GB For Immediate Delivery call KMParts com at 866 595 9616...
Страница 46: ...42 11 01 AWB2700 1426GB For Immediate Delivery call KMParts com at 866 595 9616...
Страница 67: ...For Immediate Delivery call KMParts com at 866 595 9616...
Страница 96: ...11 01 AWB2700 1426GB 92 For Immediate Delivery call KMParts com at 866 595 9616...