1
3
4
2
c
1
5
6
7
5
6
7
2
a
b
c
a
b
c
3
4
To install ModuleX safety
Ceiling finish
Butter muslin is stuck .
Paint.
Finish the seam with putty.
To Ceiling ConstructorsPlease pay attention.
When constructing, make sure
the putty is securely finished
and there will be no crack
Make sure there will be no ceiling
paint on the opening of the box
Butter muslin
Paint
Box
Finish putty
Undercoat putty
Ceiling board
Board
Board
Board
Board
Installation Details
Installation Diagram
Caution
Caution
Installation Diagram
Installation Details
For ceiling construction,it becomes
contractor's work, but be careful
on the cautions of the construction
Make sure to have the ceiling
surface and the opening to
become flush
Installation Box
Mounting
Installation Guide
Open the installation hole and
put in the Box.
Apply a screw to the punching metal
on the ceiling and secure the box.
Adjust the position of the punching
metal by the thickness of the
ceiling board.
put in the Power supply.
Install to the fixture.
Surface finish
Punching metal
Ballast
Fixture
(sold separately)
Screw
Longbow House, 14-20 Chiswell Street, London, EC1Y 4TW, U.K
Tel : +44-01273-616649
Havells Sylvania Europe Ltd.
(Contact)
(Manufacturer)
ModuleX Inc.
#21 AraiBldg, 1-20-6 Ebisu-Minami Shibuya-ku, Tokyo
Tel : +81-3-5768-3131
SX-LF103