MEDICAL GAS SERVICE CONNECTIONS

  1.  Single-service termination points are provided for each gas service. Medical gas piping connections are to be 

made in accordance with NFPA 99 before installation of the drywall.

  2.  Prior to brazing the pipes together, the component housing should be inspected to ensure that it is set for 

proper drywall installation. Brazing pipes together with the component housing out of position could 
create additional stresses on the piping when adjusted for drywall finish.

Medical gas systems provided by Modular Services have been cleaned, purged, brazed, blown down, labeled, and 
tested for cross connections and leaks in accordance with the most recent edition of NFPA 99. They are certified 
to be compliant to all of these requirements and to be leak free.  The medical gas system installer is responsible 
for connecting this manufactured assembly to the pipeline in compliance with all applicable sections of the latest 
edition of NFPA 99.  

During the process of connection to the pipeline there are multiple potential sources of contamination or damage 
to seals which could result in leaks.  First, although Modular Services takes care to protect the ends of our piping 
system and the openings of station inlets/outlets to avoid contamination, it is at this point that these contamination 
prevention measures must be removed which exposes the system to the construction environment.  Secondly, 
instrumentation must be inserted into the station inlets/outlets to properly purge the system while it is being 
brazed  in  accordance  with  the  requirements  of  NFPA  99.    Lastly,  station  inlet/outlet  front  body  assemblies  (if 
product is shipped with them installed), which are only rated to a maximum of 100 PSI, must be removed to 
conduct the initial pressure test which is required to be conducted at a minimum of 150 PSI.  After this test is 
complete the front bodies must be reinstalled to conduct the standing pressure test.

In accordance with NFPA 99 section 5.1.12.2, the installer is required to test the distribution piping in its entirety, 
which includes the medical gas manifolds provided by Modular even though they have been pretested at the 
factory.  Because of the multiple potential sources of contamination or damage to seals listed above, the installer 
is to be held responsible for repairing or replacing any seals which have been contaminated or damaged as a result 
of the process of connecting to the pipeline.  The installer shall also be responsible for protecting the station inlets/
outlets against contamination after the factory protection has been removed. 

Modular Services warrants all defects in piping materials, brazed joints, and workmanship but cannot warrant 
leaking seals once the factory provided contamination prevention materials are removed from either the end of 
the piping or the station inlet/outlet.

ELECTRICAL SERVICE CONNECTIONS

  1.  Ensure all electrical power circuits are locked off prior to hook-up.

  2.  Review wiring diagram or shop drawing.

  3.  Electrical devices are factory-installed. Wiring and connections to power supply are to be made in the field.

 4. IMPORTANT: Service connections are to be made in accordance with applicable National Electrical Codes, in 

addition to state and local codes.

DRYWALL INSTALLATION

In order to install the drywall behind the perimeter flange of the Large-Opening ArtWorks® unit, the four panel 
mounting screws (Figure 4) will need to be loosened to allow the panels to be moved away from the wall to 
provide clearance for easy placement of the drywall material.

For installation around the medical services compartment, cut drywall to a size that will allow the material to slip 
under the lip of the panel trim (a seam will be required in the location of the unit). For installation around the 
optional electric console assembly, a square opening should be cut in the drywall so that it fits over the backbox 
(the trim cover will conceal any small gaps between the console and drywall). Attachment of the drywall can 
be accomplished using standard drywall fasteners directly to the framing members and drywall supports of the 