
NOMENCLATURE
MOUNTING
1. Position the coil such that the liquid header is at the
entering airside of the coil and the hot gas header is at the
leaving airside of the coil. This orientation provides counter
flow heat exchange, which is required for proper coil
performance. (Figure 1).
2. The hot gas connection is located at the top of the hot gas
header and the liquid connection is located at the bottom
of the liquid header when properly installed. (Figure 1)
NOMENCLATURE AND INSTALLATION
Figure 1 - Condenser Coils
5 = Tube Outside Diameter
3 = 0.375”
4 = 0.500”
5 = 0.625”
C = Coil Type
C = Condenser
N = Circuiting
N = Normal - Single Circuit
F = Face Control - Multiple Circuits
Q =
1/4
serp
H =
1/2
serp
L =
3/4
serp
S = 1 serp
C = 1 1/4 serp
M = 1 1/2 serp
D = 2 serp
14 = Fins Per Inch
06 = Rows Deep
C = Fin Design
A - flat (Al, Cu)
B - corrugated (Al, Cu)
C - sine wave (Al, Cu)
D - raised lance (Al)
3/8
and 1/2
F - flat (SS, CS)
G - corrugated (SS, CS)
H - sine wave (SS, CS, Al, Cu)
24.00 = Fin Height (in)
minimum of 6 inches
144.00 = Finned Length (in)
minimum of 6 inches
5 C N 14 06 C 24.00 x 144.00