6
INSTALLATION
INSTALLATION
1. Prepare the framed opening according to
the chart above.. Provide a flexible 15 amp
120 volt circuit for hard wire installation.
2. Install L Metal Nailing Flanges.
To be performed by a qualified electrician
according to local building codes
3. Connect hard wire to the terminal block.
Terminal block
Model
H
W
D
LFV4015-SH
23”
55 3/4”
12”
LFV6015-SH
23”
75 3/4”
12”
LFV8015-SH
23”
95 3/4”
12”
LFV10015-SH
23”
115 3/4”
12”
LFV12015-SH
23”
135 3/4”
12”
W
H
D
Содержание LANDSCAPE FULLVIEW LFV10015-SH
Страница 14: ...14 NOTES MAINTENANCE ...
Страница 15: ...15 NOTES MAINTENANCE ...
Страница 16: ...16 2013 www modernflames com Please dispose of properly ...