English
16
•
•
How to install the ventilation
d. The air hole must be on the good ventilating position and 1/2 under the height of the room.
e. The pipe hole must be made in the outside and close from the upper part of the room, farm
from the ventilation pipe.
f.
The air comes and pipe area.
THERMAL BURDEN (KW)
Minimum area for the air hole and pipe hole
(cm3)
< 12
100
12
– 16
130
16 - 20
160
20 - 26
200
•
Gas Pipe installation
The size of the threaded bolt that connects the gas inflow pipe to
the water heater with the pipe is diameter G1/2.
-
Connecting to the LPG tube
1. Install the connector that is in the package to the gas
inflow
valve that is on the water heater (make sure the seal has
been installed), then connect to the hose for gas (rubber
hose) with the diameter of 9.5mm like in the picture.
2. Make sure the usage of the gas regulator is with the right
pressure (the gas pressure standard is 2800Pa for LPG,
2000Pa for nature gas).
Note:
the default this unit use LPG.
-
Connecting to the gas pipe
1. It is a must to use the gas hose or standard metal pipe.
2. The gas valve must be installed to the gas inflow track.
•
Valve installation
Valve must be installed with the gas inside the pipe and water inside the pipe to the former pipe
connection, and the hot water pipe must have valve. After the installation, checking must be done
to make sure that there is no gas and water leak.
Содержание Rapido - GI 6 V
Страница 2: ......
Страница 5: ...Bahasa Indonesia 3 Fitur dan kelengkapan tergantung pada tipe produk Bagian 1 Nama Nama Bagian ...
Страница 12: ......
Страница 22: ......