background image

BASE PREPARATION

Sand

Sand

Fill up the plastic base with at 

least 100kg of sand.

Add water and small stones for 

further stability.

Stopper cap M

WARNING:

Do not pour sand into 

the 4 screw wells.

Отзывы: