© MOBATIME
8 / 52
801314.00
2.2
Assembly diagram
2.3
Double-sided
•
Prepare 4 holes for each suspension in appropriate pitch on the ceiling and insert
the dowels.
•
Put the cables through one of the suspension tube and mount the suspension to
the ceiling.
•
Remove the screws on the bottom of the clock, on the cover with triangle sign,
which identifies the side with access to clock electronics. Remove the cover and
front glass.
•
Loosen the screws and remove the chassis with electronics; on ECO-M-DSC.100
disconnect DC power cable and flat data cable for second side from clock
electronics PCB (except PoE/PoE+); on ECO-M-DSC.180 and higher disconnect
DC power cable and flat data cable from most left digit.
•
Put the cable(s) through the opening on top side and hang the clock on the
prepared ceiling suspension.
•
Cut all cables to appropriate length.
•
Connect the power cable to appropriate power supply terminals (except
PoE/PoE+ variant).
•
Configure the Line type jumper according to used synchronisation signal (applies
only for DCF, MOBALine, Serial MOBATIME code, polarized impulse line or
IRIG-B).
•
Connect the synchronisation / temperature / GPS cable to corresponding
terminals on the clock electronics PCB and/or crimp the RJ45 jack to the
Ethernet cable respectively.