MM Kembla KemPress KPSA Скачать руководство пользователя страница 3

7.

    Check the fitting outer edge still lines up with the marking. 

Open the pressing jaw and close it around the fitting so 
the raised bump in the fitting rests inside the groove of the 
pressing jaw. 

8.

      Initiate the pressing job by pressing the start button. The 

automatic pressing process guarantees a tight connection. 

6.   

 Check the fitting is clean and the O-ring is free from debris 
and correctly sitting in place. Push fitting on tube all the 
way to the engagement marking. 

9.

   Visually inspect the fitting to ensure the press has been 

completed. The KemPress

®

 tool will flash if the fitting did 

not press correctly. If this occurs a new fitting and tube 
section is required. At the end of the project visually inspect 
each fitting to ensure none have been missed.

9

CAUTION

Brazing or soldering near to KemPress

®

 joints should be avoided 

as this may cause the seal to degrade due to heat transfer.  
The table below states the minimum distance away from the  
press joint which is acceptable to braze. If this distance cannot  
be maintained then adequate precautions must be taken such  
as fabricating the brazed section prior to assembly with the press 
fittings, wrapping the press joint in a wet rag and keeping cool 
during brazing or applying tube freezing spray.

Tube Size   15mm  22mm  28mm  35mm  42mm  54mm
Minimum  350  

550 

730 

875 

1000 

1400

Clearance  
(mm)

®

Отзывы: