Recommended routine test procedure in accordance with BS5266
• Daily check – check LED charge indicator is illuminated
• Monthly functional test - simulate a mains supply failure for approx. 30 seconds by operation of key switch
or switching off circuit breaker. Ensure normal supply is restored after test and ensure charge indicator is
illuminated
• Annual 3-hour duration test - simulate a mains supply failure for 3-hour continuous test by operation of key
switch or switching off circuit breaker. Ensure normal supply is restored after test and ensure charge indicator
is illuminated
• If the luminaire fails any of the above tests, please contact a qualified electrician. See below for test record
sheet
TESTING FOR EMERGENCY LUMINAIRES