![MK ZRF-P 3000 Скачать руководство пользователя страница 20](http://html1.mh-extra.com/html/mk/zrf-p-3000/zrf-p-3000_technical-documentation-manual_1813007020.webp)
Technical Documentation
ZRF-P 3000
mk North America, Inc.
|
105-125 Highland Park Drive
|
Bloomfield, CT 06002
|
(860) 769-5500
|
www.mknorthamerica.com
©2020
|
Page 20
9
CONVEYOR MAINTENANCE - TIMING BELT REPLACEMENT
General Remarks:
• Follow the steps in section 8 for removing the belt.
• Remove slider bed and replace with a new one.
• Reassemble in reverse order.
• Timing belts must be tensioned prior to use. (See Section 7)
All work to be performed by qualified personnel only.
Conveyor power must be disconnected before replacing the belt.