![MK ZRF-P 3000 Скачать руководство пользователя страница 16](http://html1.mh-extra.com/html/mk/zrf-p-3000/zrf-p-3000_technical-documentation-manual_1813007016.webp)
Technical Documentation
ZRF-P 3000
mk North America, Inc.
|
105-125 Highland Park Drive
|
Bloomfield, CT 06002
|
(860) 769-5500
|
www.mknorthamerica.com
©2020
|
Page 16
7
CONVEYOR MAINTENANCE - BELT TENSIONING
7.1 Standard Idler
17
General Remarks:
• Timing belts may need to be tracked due to shifting during shipping.
• Prior to delivery of the mk conveyor, the belt was tensioned and tracked at the factory.
• Belt tracking should only be done at the idler end.
• Avoid over tensioning the belt, increase slack in timing belt if necessary.
All work to be performed by qualified personnel only.
Conveyor power must be disconnected before replacing the belt.