![Mitsubishi GOT2000Series Скачать руководство пользователя страница 203](http://html1.mh-extra.com/html/mitsubishi/got2000series/got2000series_connection-manual_1809187203.webp)
8. CONNECTION TO YOKOGAWA TEMPERATURE CONTROLLER
8.5 Temperature Controller Side Setting
8 - 29
8
CON
N
ECTION
T
O
YOKOGA
W
A
TEMPERA
T
URE C
O
NTROLLER
8.5
Temperature Controller Side Setting
POINT
POINT
POINT
(1) YOKOGAWA temperature controller
For details of YOKOGAWA temperature controller,
refer to the following manual.
User's Manual of the YOKOGAWA temperature
controller
(2) RS232C/RS485 converter
For details on communication settings of the
RS232C/RS485 converter, refer to the following
manual.
User's Manual of RS232C/RS485 converter
8.5.1
Connecting to GREEN Series
Communication settings
Make the communication settings by operating the key
of the temperature controller.
(1) For the UT /UP /UM /US1000 (except UT750,
UP750)
*1
Adjust the settings with GOT settings.
*2
Avoid duplication of the address with any of the other units.
(2) For the UT750, UP750
*1
Adjust the settings with GOT settings.
*2
Avoid duplication of the address with any of the other units.
Model name
Refer to
Temperature controller
GREEN
UT100
UT2000
UTAdvanced
RS232C/RS485 converter ML2-
Item
Set value
Transmission speed
9600bps (fixed)
Data bit
*1
7bits, 8bits
Parity bit
*1
Even, odd, none
Stop bit
*1
1bit, 2bits
Address
*1*2
1 to 99
Protocol selection
*1
0: PC link communication (without sum check)
1: PC link communication (with sum check)
Item
Set value
Transmission speed
*1
RS-485
communication
9600bps (fixed)
High performance
RS-485
communication
9600bps, 19200bps,
38400bps
Data bit
*1
7bits, 8bits
Parity bit
*1
Even, odd, none
Stop bit
*1
1bit, 2bits
Address
*1*2
1 to 99
Protocol selection
*1
RS-485
communication
0: PC link communication
(without sum check)
1: PC link communication
(with sum check)
High performance
RS-485
communication
0: PC link communication
(without sum check)
1: PC link communication
(with sum check)
Содержание GOT2000Series
Страница 2: ......
Страница 17: ...A 15 REVISIONS WARRANTY...
Страница 52: ...1 30 1 PREPARATORY PROCEDURES FOR MONITORING 1 6 Checking for Normal Monitoring...
Страница 54: ......
Страница 78: ...3 10 3 CONNECTION TO HITACHI PLC 3 6 Device Range that Can Be Set...
Страница 100: ...4 22 4 CONNECTION TO FUJI PLC 4 7 Precautions...
Страница 174: ...7 24 7 CONNECTION TO YOKOGAWA PLC 7 4 Device Range that Can Be Set...
Страница 262: ...9 54 9 CONNECTION TO RKC TEMPERATURE CONTROLLER 9 7 Precautions...
Страница 280: ...10 18 10 CONNECTION TO ALLEN BRADLEY PLC 10 4 Device Range that Can Be Set...
Страница 296: ...11 16 11 CONNECTION TO GE PLC 11 7 Precautions...
Страница 308: ...12 12 12 CONNECTION TO LS INDUSTRIAL SYSTEMS PLC 12 6 Device Range that Can Be Set...
Страница 332: ...14 18 14 CONNECTION TO SIEMENS PLC 14 4 Device Range that Can Be Set...
Страница 334: ...REVISIONS 2...
Страница 337: ......