3
8
8.2
[Fig. 8.2.1]
B
A
A
B
C
D
e
a
b
c
d
C
C
C
C
C
B
A
a
b
c
d
e
C
D
C
C
C
C
A
A
: Outdoor unit
B
: First branch
C
: Indoor unit
D
: Cap
7
[Fig. 7.1.1]
B
A
A
: M10 anchor bolt procured at the site.
B
: Corner is not seated.
A
(mm)
B, C, D
(mm)
a, b, c, d, e
(mm)
Ï
Downstream unit model total
~ 200
201 ~ 400
401 ~ 650
Ó
The 1st branch of P450 ~ P650
651 ~
È
The 1st branch of P700, P750, P800
Ì
Branch kit model
CMY-Y102S-G
CMY-Y102L-G
CMY-Y202-G
CMY-Y302-G
Å
Outdoor model
P200
P250
P300
P350
P400
P450
P500
P550
P600
P650
ı
Liquid pipe
ø9.52
*1 ø9.52
*2 ø9.52
ø12.7
ø12.7
ø15.88
ø15.88
ø15.88
ø15.88
ø15.88
Ç
Gas pipe
ø19.05
ø22.2
ø22.2
ø28.58
ø28.58
ø28.58
ø28.58
ø28.58
ø28.58
ø28.58
Î
Total capacity of indoor units
~ 140
141 ~ 200
201 ~ 300
301 ~ 400
401 ~ 650
651 ~ 800
801 ~
ı
Liquid pipe
ø9.52
ø9.52
ø9.52
ø12.7
ø15.88
ø19.05
ø19.05
Ç
Gas pipe
ø15.88
ø19.05
ø22.2
ø28.58
ø28.58
ø34.93
ø41.28
‰
Model number
20,25,32,40,50
63,71,80,100,125,140
200
250
ı
Liquid pipe
ø6.35
ø9.52
ø9.52
ø9.52
Ç
Gas pipe
ø12.7
ø15.88
ø19.05
ø22.2
Ô
4-Branching header
(Downstream unit
model total
<
=
200)
CMY-Y104-G
8-Branching header
(Downstream unit
model total
<
=
400)
CMY-Y108-G
Ò
10-Branching header
Downstream unit
model total
<
=
650)
CMY-Y1010-G
*1 ø12.7 for over 90m
*2 ø12.7 for over 40m
Содержание PUY-P-YGM-A
Страница 17: ...I ...