CONTENTS
1. STRUCTURE OF THE SEWING MACHINE
····································
1
2. SPECIFICATIONS
·····································································
2
3. INSTALLATION
········································································
3
3-1. Preparation of the table
··········································································
3-2. Preparation of the steel stand
··································································
3-3. Installation of the control box
···································································
3-4. Installation of the operation panel
·····························································
3-5. Installation of the power switch and foot switch
············································
3-6. Installation of the oil pan
·········································································
3-7. Installation of the machine head
·······························································
3-8. Installation of gas spring
·········································································
3-9. Installation of the tilting detect switch
·························································
3-10. Connection of the electric cables
····························································
3-10-1. How to remove the motor cover
························································
3-10-2. Connection of the PF axis cables
······················································
3-10-3. Connection of the XY axis cables
······················································
3-10-4. Connection of the main servo cables
·················································
3-10-5. Connection of the I/F board cables
····················································
3-10-6. Connection of the optional output connector
········································
3-10-7. Fixing of the cables
········································································
3-11. Connection of the air tube
·····································································
3-11-1. Installation of the filter regulator and air piping
·····································
3-11-2. Piping of the oil drainage tube
··························································
3-12. Installation of the thread stand
·······························································
3-13. Installation of the eye guard
···································································
3
4
4
4
4
5
5
6
7
8
9
9
10
11
12
13
13
14
14
15
17
17
4. LUBRICATION
·········································································
18
4-1. Filling the oil tank
··················································································
18
Содержание PLK-J2516R-YU
Страница 1: ...INDUSTRIAL SEWING MACHINE MODEL PLK J2516R YU TECHNICAL MANUAL SEWING MACHINE HEAD A180E803P02 ...
Страница 68: ......
Страница 70: ...Stand part 1 Thickness 2mm Stand part 2 Thickness 2mm ...
Страница 72: ...Printed in Japan ...