39
8. Removing the heat exchanger
(1) Remove the panel and the corner box. (Refer to procedure 1)
(2) Remove the electrical box (Refer to procedure 3) and the
nozzle assembly (Refer to procedure 4).
(3) Remove the water cut.
(4) Remove the pipe thermistors from each holder.
(5) Disconnect the connector for ground wire.
(6) Remove 3 screws fixing the left side of the heat
exchanger. (See Photo 9)
(7) Remove the heat exchanger.
9. Removing the room temperature thermistor
(1) Remove the panel and corner box. (Refer to procedure 1)
(2) Remove the electrical box covers.
(3) Remove the room temperature thermistor.
(4) Disconnect the connector (CN20) on the indoor controller
board.
Photo 11
Photo 12
Photo 13
Heat exchanger
Water cut
Indoor controller
board (I.B.)
Room temp.
thermistor (TH1)
Liquid pipe
thermistor (TH2)
Lead wire for TH5
Connector for
ground
Heat exchanger
PHOTOS
OPERATION PROCEDURE
OCH661