background image

Flare dimensions

[

B dimensions

(mm)

A dimensions (mm)

Copper

pipe O.D.

(mm)

Clutch-style

Flare tool for R410A

Flare tool for R22, R407C

Tightening torque

N.m(kgf.cm)

[

B

45

- i

2

-

90

-  i

0.5

-

R0.4~R0.8

A

Copper
pipe

Die

0~0.5

[

6.35(1/4")

1.0~1.5

0~0.5

1.0~1.5

[

9.52(3/8")

8.7~9.1

12.8~13.2

14~18(140~180)

34~42(340~420)

External LEV Box

1

30~40mm

30mm

Band

4

Pipe cover

3

Insulation material
for refrigerant pipe
(Procure locally)

Band

4

Joint pipe

2

R410A : Only for indoor unit 63 models
R407C : Only for indoor unit 50, 63 models

Push in

Pipe cover

3

Insulation material
for refrigerant pipe

Refrigerant pipe

Cross-section view of connection

Electrical box

Put the connector
in the electrical box.

Indoor unit

Cable (Accessory:100mm)

Cable (Accessory:5300mm)

CN60 connector (LEV, white)

Controller board

Linear expansion valve

External LEV Box

1

LEV

Electrical box

Put the connector
in the electrical box.

Indoor unit

Remove

Cable (Accessory:5300mm)

CN60 connector (LEV, white)

Controller board

Lead wire of
Connector (CN60)

Relay connector

Linear expansion valve

External LEV Box

1

LEV

Controller board

Connect to the CN60 connector.

Cable for External LEV Box 

Electrical box

Fastener

5

Use the clamp for on-site wiring under the electrical 
parts box to fix the cable together with the on-site 
wirings (power supply cable, transmission cable and
remote controller cable).

Example: PKFY-P.VBM-E

3

Wiring procedure

Wiring shown below can be applied when the connector board and LEV are connected with relay. 

Make sure to complete the work below before turning on the indoor unit

Wiring procedure differs depending on the indoor unit. To remove the electrical box cover when connecting the cables of each
indoor unit, refer to the installation manuals of each indoor unit. Fix the cable together with the on-site wirings (power supply cable,
transmission cable and remote controller cable). Use the fastener

5

 to bind the cables in the electrical box.

4

Test run

Carry out test run referring to the installation manual enclosed with indoor/outdoor unit.

1. After deciding the installation location, carry out flaring work of liquid pipe and apply thin layer of refrigerant oil (procure locally) to
    the flared seat surface.
2. Connect the field refrigerant piping.

3. Wrap the enclosed pipe cover

3

 around the liquid pipe connection, pushing it on the outside of External LEV Box

1

4. Secure both ends of pipe cover

3

 with the enclosed bands

4

 to make sure it is insulated.

When flare tools for R22, R407C are used for R410A flaring work, refer to the table above. The size adjustment gauge can be used to secure A measurements.

Apply thin layer of ester oil, ether oil or alkylbenzene oil to the entire flare seat surface.

w

Do not apply it to the screws as it may cause loosening of the flare nut.

Make sure to use the flare nut attached to the unit
(Using commercial item may cause breaks).

2-2  Connecting pipes

At factory shipment, the connector for LEV in the indoor unit is connected to the connector (CN60) on indoor controller 
board. Replace the connector (CN60) with the white connector of the cable (accessory: 100mm) for External LEV Box

1

Bind the removed lead wire of LEV with fastener

and place it in the electrical box.

Remove the relay connector in electrical box. Connect the lead wire of the connector (CN60) to the connector of the cable 
(Accessory:5300mm) of External LEV Box

1

. Bind the removed lead wire of LEV with fastener

and place it in the electrical 

box. Remove the cable (accessory: 100mm) since it is unnecessary. 