7
CENTRALIZED CONTROL
M1 M2 S
M1
M2
S
3
4.Installation procedure
【
Applicable model:Group B
】
8
Lead wire-B
8
Lead wire-B
1
M-NET board
1
M-NET board
5
Terminal Screw
(M4
o
25)
4
Terminal block
4
Terminal block
6
Label
9
Ground wire and screw
(Note 1) See the Caution on page 2
7
Lead wire-A
7
Lead wire-A
0
Fastener
CN2M
Control P.C. board holder (Back)
Control P.C. board
Control P.C. board holder
Screw
CN5
CN741
【
w
2
】
【
w
1
】
【
w
1
】
Pass
⑦
Lead wire-A and
⑧
Lead wire-B through the upper clips (right side) on the
control P.C. board holder.
【
w
2
】
Pass
⑧
Lead wire-B through the right clips (upper side) on the control P.C. board holder.
1
Remove the two screws and remove the
control P.C. board holder.
4
Use the two screws removed previously
to install the control P.C. board holder in
the previous position.
6
Attach
⑥
Label to the position shown in
the figure.
8
Refer to the wiring diagram, and connect
the
⑧
Lead wire-B that you previously
connected to CN2M on the
①
M-NET board
to the M1 and M2 terminals on the
④
Terminal block.
There is no polarity difference.
9
Bundle the front and back of the coil
sections of
⑧
Lead wire-B using the
⑩
Fasteners as shown in the figure.
(Note 1)
If required, connect the shield of the M-NET
transmission wire to the main unit using the
⑨
Ground wire and screw (M4 x8).
(See the Caution on page 2)
(Note 2)
Take great care that no lead wire is caught
on anything when installing panels.
7
Refer to the wiring diagram, and connect
the
⑦
Lead wire-A that you previously
connected to CN5 on the
①
M-NET board
to CN741 (Color: Red) on the control
P.C. board.
5
Use the
⑤
Terminal screw (M4 x 25) to fix
the
④
Terminal block in the position shown
in the figure.
w
The
④
Terminal block has a boss for
positioning. Align the boss with the positioning
hole on the metal plate.
3
Install the
①
M-NET Board to which the
wires were attached in the previous step
to the back of the control P.C. board holder.
w
Set the addresses on the
①
M-NET Board
before installing into the electrical parts box.
w
Be sure that the M-NET board is installed
in the correct orientation (so that the CN2M
is upwards and CN5 is downwards).
2
Attach
⑦
Lead wire-A to CN5 (Color: White)
on the
①
M-NET Board and
⑧
Lead wire-B to
CN2M (Color: White) on the
①
M-NET Board.
1
2
2
3
4
5
6
7
8
9
Control P.C. board
Содержание PAC-IF01MNT-E
Страница 9: ......