11-5. TROUBLESHOOTING FLOW
Are the voltages balanced?
Disconnect the connector between
compressor and the power module (IC700).
Replace the inverter P.C. board.
Check the voltage between terminals.
Check the compressor.
See 11-5. “Check of compressor”.
No
Yes
See 11-5. “Check of open phase”.
A How to check inverter/compressor
Refer to 11-5. “Check of compressor
operation time”.
Does the compressor operate continuously?
Refer to 11-5. “Check of compressor start failure”.
OK.
No
Yes
Refer to 11-5. “Check of compressor
winding”.
Is the compressor normal?
Replace the compressor.
No
Yes
B Check of open phase
C Check of compressor
●
With the connector between the compressor and the power module disconnected, activate the inverter and check if the in-
verter is normal by measuring
the voltage balance
between the terminals.
Output voltage is 50 - 130 V. (The voltage may differ according to the tester.)
<< Operation method>>
Start cooling or heating operation by pressing EMERGENCY OPERATION switch on the indoor unit. (TEST RUN OPERA-
TION: Refer to 8-3.)
<<Measurement point>>
At 3 points
BLK (U)-WHT (V)
BLK (U)-RED (W)
WHT(V)-RED (W)
NOTE
: 1. Output voltage varies according to power supply voltage.
2. Measure the voltage by analog type tester.
3. During this check, LED of the inverter P.C. board
fl
ashes 9 times. (Refer to 11-6.1.)
Measure AC voltage between the lead wires at 3 points.
OBH629A
Содержание MUZ-SF25VE
Страница 9: ...9 WIRING DIAGRAM 6 MUZ SF25VE MUZ SF35VE MUZ SF25VEH MUZ SF35VEH OBH629A ...
Страница 10: ...10 MUZ SF42VE MUZ SF50VE MUZ SF42VEH MUZ SF50VEH OBH629A ...
Страница 51: ...51 OBH629A ...