38
12-5. TROUBLESHOOTING FLOW
A How to check inverter/compressor
Refer to 12-5. “Check of compressor
operation time”.
Does the compressor operate continuously?
Refer to 12-5. “Check of compressor start failure”.
OK
No
Yes
Refer to 12-5. “Check of compressor
winding”.
Is the compressor normal?
Replace the compressor.
No
Yes
B Check of open phase
C Check of compressor
●
With the connector between the compressor and the power module (IC700) disconnected, activate the inverter and check if
the inverter is normal by measuring
the voltage balance
between the terminals.
Output voltage is 50 - 130V. (The voltage may differ according to the tester.)
<< Operation method>>
Start cooling or heating operation by pressing EMERGENCY OPERATION switch on the indoor unit. (TEST RUN OPERA-
TION: Refer to 9-3.)
<<Measurement point>>
At 3 points
BLK (U)-WHT (V)
BLK (U)-RED (W)
WHT(V)-RED (W)
NOTE
: 1. Output voltage varies according to power supply voltage.
2. Measure the voltage by analog type tester.
3. During this check, LED of the inverter P.C. board
fl
ashes 9 times. (Refer to 12-6.1.)
Measure AC voltage between the lead wires at 3 points.
Are the voltages balanced?
Disconnect the connector between the compressor
and the power module (IC700).
Replace the inverter P.C. board.
Check the voltage between terminals.
Check the compressor.
See 12-5. “Check of compressor”.
No
Yes
See 12-5. “Check of open phase”.
OBH768
Содержание MUZ-LN25VGHZ
Страница 10: ...10 OUTLINES AND DIMENSIONS 6 Unit mm MUZ LN25VGHZ MUZ LN35VGHZ OBH768 ...
Страница 12: ...12 WIRING DIAGRAM 7 MUZ LN25VGHZ MUZ LN35VGHZ OBH768 ...
Страница 13: ...13 MUZ LN50VGHZ OBH768 ...