19
SERVICE FUNCTIONS
11
11-1. CHANGE IN DEFROST SETTING
Changing defrost finish temperature
<JS> To change the defrost finish temperature, cut/solder the JS wire of the outdoor inverter P.C. board.
(Refer to 12-6-1.)
Jumper wire
Defrost finish temperature (
°C
)
JS
Soldered (Initial setting)
5
None (Cut)
10
11-2. PRE-HEAT CONTROL SETTING
PRE-HEAT CONTROL
When moisture gets into the refrigerant cycle, it may interfere the start-up of the compressor at low outside temperature.
The pre-heat control prevents this interference. The pre-heat control turns ON when the discharge temperature thermis-
tor is 20°C or below. When the pre-heat control turns ON, the compressor is energized. (About 50 W)
Pre-heat control setting
<JK>
ON: To activate the pre-heat control, cut the JK wire of the inverter P.C. board.
OFF: To deactivate the pre-heat control, solder the JK wire of the inverter P.C. board.
(Refer to 12-6.1)
NOTE:
When the inverter P.C. board is replaced, check the jumper wires, and cut/solder them if necessary.
MUZ-AP20VG
OBH839A
Содержание MUZ-AP20VG
Страница 8: ...8 Unit mm MUZ AP20VG OUTLINES AND DIMENSIONS 6 OBH839A ...
Страница 9: ...9 WIRING DIAGRAM 7 MUZ AP20VG E1 ET1 ER1 OBH839A ...
Страница 43: ...43 OBH839A ...