36
10-5. TROUBLESHOOTING FLOW
Are the voltages balanced?
Disconnect the connector between the compressor and the
power module (IC700).
Replace the inverter P.C. board.
Check the voltage between terminals.
Check the compressor.
See 10-5. “Check of compressor”.
No
Yes
See 10-5. “Check of open phase”.
A How to check inverter/compressor
Refer to 10-5. “Check of compressor
operation time”.
Does the compressor operate continuously?
Refer to 10-5. “Check of compressor start failure”.
OK
No
Yes
Refer to 10-5. “Check of compressor
winding”.
Is the compressor normal?
Replace the compressor.
No
Yes
B Check of open phase
C Check of compressor
●
With the connector between the compressor and the power module (IC700) inverter and check if the inverter is normal by
measuring
the voltage balance
between the terminals.
Output voltage is 50 - 130 V. (The voltage may differ according to the tester.)
<< Operation method>>
Start cooling or heating operation by pressing EMERGENCY OPERATION switch on the indoor unit. (TEST RUN OPERA-
TION: Refer to 7-6.)
<<Measurement point>>
At 3 points
BLK (U)-WHT (V)
BLK (U)-RED (W)
WHT(V)-RED (W)
NOTE
: 1. Output voltage varies according to power supply voltage.
2. Measure the voltage by analog type tester.
3. During this check, LED of the inverter P.C. board blinks 9 times. (Refer to 10-6.1.)
Measure AC voltage between the lead wires at 3 points.
OBH819A
Содержание MSZ-WR NA Series
Страница 9: ...9 5 WIRING DIAGRAM MUZ WR09NA MUZ WR12NA MUZ WR18NA OBH819A ...
Страница 10: ...10 MUZ WR24NA OBH819A ...
Страница 57: ...57 OBH819A ...