OPERATING PROCEDURE
PHOTOS
4. Removing the nozzle assembly
(1) Remove the panel (Refer to 1.) and the corner box
right.
(2) Remove the indoor/outdoor connecting wire (Refer to 2.).
(3) Remove the electrical cover (Refer to 2.).
(4) Disconnect the following connector:
<Indoor electronic control P.C. board>
CN151 (Vane motor)
(5) Remove the display P.C. board holder.
(6) Pull out the drain hose from the nozzle assembly and
remove the nozzle assembly.
(7) Remove the vane motors (Refer to 5.).
Photo 4
5. Removing the horizontal vane motor
(1) Remove the nozzle assembly (Refer to 4.).
(2) Remove the screws of the vane motor unit cover, and
pull out the vane motor unit
(3) Remove the screws of the vane motor unit.
(4) Disconnect the connector from the vane motor.
(5) Remove the vane motor from the vane motor unit.
42
Screws of
the vane motor unit
cover
Screws of
the vane motor
unit
OBH600E
Содержание MSZ-SF25VE
Страница 12: ...12 MSZ SF25VE E1 E2 EN1 EN2 MSZ SF42VE E1 E2 EN1 EN2 WIRING DIAGRAM 6 MSZ SF25VE ER2 MSZ SF42VE ER2 OBH600E ...
Страница 13: ...13 MSZ SF35VE E1 E2 EN1 EN2 MSZ SF50VE E1 E2 EN1 EN2 MSZ SF35VE ER2 MSZ SF50VE ER2 OBH600E ...
Страница 14: ...14 MSZ SF25VE2 E1 EN1 ER1 MSZ SF42VE2 E1 EN1 ER1 MSZ SF35VE2 E1 EN1 ER1 MSZ SF50VE2 E1 EN1 ER1 OBH600E ...
Страница 15: ...15 MSZ SF25VE3 E1 EN1 ER1 MSZ SF42VE3 E1 EN1 ER1 MSZ SF35VE3 E1 EN1 ER1 MSZ SF50VE3 E1 EN1 ER1 OBH600E ...