OPERATING PROCEDURE
PHOTOS/FIGURES
3.
Removing the nozzle assembly and the vane
motor
<Removing the nozzle assembly>
(1) Remove the panel (Refer to section 1.) and the corner
box.
(2) Remove the V.A. clamp, and then the indoor/outdoor
connecting wire. (Refer to section 2.)
(3) Remove the electrical cover. (Refer to section 2.)
(4) Disconnect the following connectors on the electronic
control P.C. board:
CN151 (Vane motor)
(5) Pull out the drain hose from the nozzle assembly and
remove the nozzle assembly.
<Removing the vane motor>
(6) Cut the fixing band of the vane motor wire. (Photo 6)
(7) Remove the screws of the vane motor and remove the
vane motor. (Photo 5)
(8) Disconnect the connector from the vane motor.
36
Photo 5
Screws of the vane motor
Fixing band of the vane motor wire
Photo 6
OBH822B