14
OCH738
5
DATA
Main piping:
Liquid line size
ø9.52 overall length
[m]
o
0.04 (Gas line: ø25.4)
Branch piping:
Liquid line size
ø9.52 overall length
o
0.03 (Gas line: ø15.88)
Branch piping:
Liquid line size
ø6.35 overall length
o
0.01
Amount of additional
charge
Main piping:
Liquid line size
ø12.7 overall length
o
0.06
=
Maximum additional
charge
ZM200
2.9 kg
ZM250
2.4 kg
Additional charge amount
for 70 m
ZM200
1.6 kg
ZM250
2.4 kg
+
+
+
–
When the total length of the piping exceeds 70 m, calculate the amount of additional charge based on the following requirements.
Note: If the calculation produces a negative number (i.e. a “minus” charge), of if calculation results in an amount that is less than the “Additional charge
amount for 70”, perform the additional charge using the amount shown in “Additional charge amount for 70 m”.
[kg]
[m]
o
0.06 [kg/m]
[m]
o
0.04 [kg/m]
[m]
o
0.03 [kg/m]
[m]
o
0.01 [kg/m]
ZM200
1.2 kg
ZM250
1.8 kg
5-1. REFILLING REFRIGERANT CHARGE (R32: kg) PUZ-ZM200/250
AVB52FBAMT
Service Ref.
Compressor model
(Winding temperature at 20°C)
U-V
U-W
W-V
Winding
Resistance
(
"
)
0.305
0.305
0.305
PUZ-ZM200YKA.UK
PUZ-ZM250YKA.UK
Additional charge is required for pipes longer
than 30 m.
Service Ref.
Piping length (one way)
Initial
charged
10 m
20 m
30 m
40 m
50 m
60 m
75 m
PUZ-ZM200YKA.UK
5.7
6.0
6.3
+0.4 (6.7) +0.8 (7.1) +1.2 (7.5) +1.6 (7.9)
6.3
PUZ-ZM250YKA.UK
6.2
6.5
6.8
+0.6 (7.4) +1.2 (8.0) +1.8 (8.6) +2.4 (9.2)
6.8
5-3. COMPRESSOR TECHNICAL DATA
5-2. ADJUSTING THE AMOUNT OF REFRIGERANT PUZ-ZM200/250
Service Ref.
Initial
charged
Amount of additional refrigerant charge (kg)
31–40 m and less
41–50 m and less
51–60 m and less
61–70 m and less
PUZ-ZM200YKA.UK
6.3
0.4
0.8
1.2
1.6
PUZ-ZM250YKA.UK
6.8
0.6
1.2
1.8
2.4