34
OPERATING PROCEDURE
PHOTOS & ILLUSTRATIONS
9. Removing the drain pump (DP) and float switch (FS)
(1) Remove the drain pan. (See Photo 6)
(2) Cut the hose band and remove the hose.
(3) Remove the drain pump assembly (3 screws and 2 hooks).
(4) Remove the drain pump (3 screws).
(5) Remove the float switch (2 screws).
Photo 8
Photo 9
Drain pump
Hose band
Float switch
Drain pump
assembly fixing screw
Drain pump
fixing screw
Float switch
fixing screw
10. Removing the heat exchanger
(1) Remove the drain pan. (See Photo 6)
(2) Remove the 3 screws of the piping cover, and pull out
piping cover.
(3) Remove the 2 screws of coil plate.
(4) Remove the 2 screws of the coil.
(5) Remove the screw of the coil support.
(6) Pull out the heat exchanger.
Photo 10
Coil support
fixing screw
Heat exchanger
fixing screw
Coil support
Heat exchanger
Coil plate
Piping cover
Содержание Mr. Slim PLA-A12BA4
Страница 35: ...35 ...