background image

External Dimensions, Installation and Connections

Wiring Diagrams (Continued)

Wiring Diagrams (Continued)

Optional Plug-in Module: ME-4210-SS96B

Optional Plug-in Module: ME-0052-SS96

Optional Plug-in Module: 
ME-0000MT-SS96

Optional Plug-in Module: 
ME-0000BU-SS96

Optional Plug-in Module: 
ME-0040MT2-SS96

Optional Plug-in Module: ME-0040C-SS96

1-phase 3-wire system

1-phase 2-wire system: With VT

Fig. 3. 3-phase 3-wire (star)

Fig. 2. 3-phase 3-wire (delta)

Fig. 1. 3-phase 4-wire (star)

Fig. 6. 1-phase 2-wire (star)

Fig. 4. 1-phase 3-wire

Fig. 5. 1-phase 2-wire (delta)

Note

1. The voltage input terminal will vary depending on if it is a 3-phase, 3-wire system or otherwise.
2. VT/CT polarity errors will cause incorrect measurement.
3. Always use the grounding terminal (    ) in a grounded state. Perform grounding with a grounding resistance of 100 

Ω

 or less. 

Insufficient grounding may cause erroneous operation.

4. Use shielded twisted-pair cables for transmission signal lines.
5. Install 120 

Ω

 terminating resistors between terminals “T/R+” and “T/R-“ for devices at both ends of MODBUS RTU communi-

cation line.

6. Use the thickest possible grounding wire to ensure low impedance.
7. MODBUS RTU communication signal cables must not be in close proximity or bundled with high-voltage cables.

Condition

Distance

Power lines of 600 V AC or less

Other power lines

300 mm or more
600 mm or more

1.  Pulse output, alarm output, and digital input/output cables must not be in close proximity or bundled with power cables or 

high-voltage cables. When laid parallel, separate by the distance shown in the following table.

2.  Analog output cables must not be in close proximity or bundled with other power cables or input cables (e.g., VT, CT, auxiliary 

power supply). In addition, to prevent noise, surge and induction, use shielded cables or twisted-pair cables. Make sure that 
cables are as short as possible. 

3.  There is no insulation between the MODBUS RTU communication portion and the optional module ME-4210-SS96B, 

ME-0040C-SS96.

4.  Use only designated cables when connecting the CC-Link (see communication specifications). CC-Link dedicated cables 

cannot be used at the same time as CC-Link dedicated high-performance cables. Normal data transmission cannot be 
guaranteed if used at the same time. 

 

The terminal resistance value varies depending on the type of dedicated cable. 

5.  For cables connecting the CC-Link, connect shielded cables to “SLD” and ground “FG” cables. “SLD” and “FG” cables are 

connected inside the unit. 

6.  CC-Link communication lines are small signal circuits: separate from strong electrical circuits by a distance of 10 cm or more, 

or 30 cm or more if laid in parallel over a long distance. 

 

Ground the terminal before use. 

7.  For CC-Link communication, always use dedicated lines and comply with conditions for total wiring distance, distance between 

stations and terminal resistance values according to the communication speed. Not doing so may prevent normal communica-
tion (see the CC-Link Master Unit Operations Manual for information on dedicated lines and wiring conditions).

8.  The terminal resistance supplied with the CC-Link Master Unit must always be used for the units at both ends of the CC-Link 

communication line. If the meter is at the end of the CC-Link communication line, connect it between the DA and DB terminals.

9.  Communication errors may occur under the influence of high-frequency noise from other devices in the installation environ-

ment during high-speed communication (100 Mbps) via 100BASE-TX connection of MODBUS TCP.

 

Measures to be taken when the network system is configured to avoid the influence of high-frequency noise are shown below.

 

(1) Wiring connection

 

     • 

When laying a twisted pair cable, do not bundle the cable together with any main circuit line or power line or lay it close to such a line.

 

     • Keep the twisted pair cables in the duct.

 

(2) Communication method

 

     • Increase the number of communication retries as needed.

 

     • 

Replace the hub to be used for connection with that for 10 Mbps, and communicate at a data transmission speed of 10 Mbps.

10. Do not connect any terminal or RJ45 connector in the live state.
11. Do not insert or remove the SD memory card in the live state.

Note

Phase/Wire

3-phase 4-wire

3-phase 3-wire

1-phase 3-wire

1-phase 2-wire*

Connection

Star

Delta

Star

Delta

Star

Figure

Figure 1
Figure 2
Figure 3
Figure 4
Figure 5
Figure 6

Max. 277 V AC (L-N)/480 V AC (L-L)
Max. 220 V AC (L-L)
Max. 440 V AC (L-L)
Max. 220 V AC (L-N)/440 V AC (L-L)
Max. 220 V AC (L-L)
Max. 440 V AC (L-L)

Rated voltage

* The circuit derived from the 3-phase 3-wire delta connection and the 1-phase 2-wire transformer circuit have the maximum rating of 220 V AC.

  The circuits derived from the 3-phase 4-wire and 3-phase 3-wire star connections and 1-phase 3-wire connection have the maximum rating of 440 V AC.

Rated voltage for each phase/wire system

DICOM

24 V DC

Digital input 1

Digital input 2

Digital input 3
Digital input 4

ME-0040C-SS96

ME96SSRB-MB
ME96SSHB-MB

Protective

Earthing

Protective

Earthing

CC-Link

Communication

CC-Link

Communication

DA
DB

DG

SLD

FG

SLD

DG

DB
DA

DI1
DI2
DI3
DI4

+

C1

+

C3

C2

+

C2

C1

C3
P1
P2

PN

P3

MA

MB

SLD

SG

T/R-

T/R+

Protective

Earthing

ME-0040MT2-SS96

ETHERNET

ME96SSHB-MB

+C1

C1

+C2

C2

+C3

C3

P1

P3

PN

P2

T/R+

T/R-

SG

SLD

MA

MB

DICOM

24 V DC

Digital input 1

Digital input 2

Digital input 3

Digital input 4

DI1
DI2
DI3
DI4

2 ports







{

ME-4210-SS96B

24 V DC

CH1+
CH1−
CH2+
CH2−
CH3+
CH3−
CH4+

C2B/COM2

C2A/A2

CH4−

Analog output CH1 

Analog output CH2 

Analog output CH3 

Analog output CH4  

Pulse output 1

 

/ Alarm output 1

Pulse output 2 / Alarm output 2

Digital input

C1A/A1
C1B/COM1

Protective

Earthing

ME96SSRB-MB

ME96SSHB-MB

+C1

+C3

C2

+C2

C1

C3

P1

P2

PN

P3

MA

MB

SLD

SG

T/R−

T/R+

DI+
DI−

Digital input 1

DI1+
DI1−
DI2+
DI2−
DI3+
DI3−
DI4+
DI4−
DI5+
DI5−
DO1+
DO1−
DO2+
DO2−

Digital input 2

Digital input 3

Digital input 4

Digital input 5

24 V DC

Digital output 1

Digital output 2

ME-0052-SS96

DI1−,DI2

,DI3

,DI4

,DI5

−  

are connected inside. 

Protective

Earthing

 

ME96SSRB-MB
ME96SSHB-MB

+C1

C1

+C2

C2

+C3

C3

P1

P3

PN

P2

T/R+

T/R−

SG

SLD

MA

MB







{

Protective

Earthing

ME-0000MT-SS96

ETHERNET

ME96SSRB-MB
ME96SSHB-MB

+C1

C1

+C2

C2

+C3

C3

P1

P3

PN

P2

T/R+

T/R−

SG

SLD

MA

MB

1 port

SD

CARD

Protective

Earthing

ME-0000BU-SS96

 

ME96SSRB-MB
ME96SSHB-MB

+C1

C1

+C2

C2

+C3

C3

P1

P3

PN

P2

T/R+

T/R−

SG

SLD

MA

MB

q

Auxiliary power supply

100 V AC to 240 V AC or 100 V DC to 240 V DC

w

Fuse (recommendation)  

Rated current: 0.5 A, Rated breaking capacity: 250 V AC 

1,500 A / 250 V DC 1,500 A (a UL certified product)

e

If MODBUS RTU devices do not have the SG terminal, 

the wiring between SG terminals is not necessary.

r

Install 120 

Ω

 terminating resistors between terminals 

‘T/R+’ and ‘T/R-’ for devices at both ends of 

MODBUS RTU communication line.

*1 For low voltage circuits, it is not necessary to ground the 

VT and CT secondary sides.

*2 Do not connect the NC terminal.

q

Auxiliary power supply

100 V AC to 240 V AC or 100 V DC to 240 V DC

w

Fuse (recommendation) 

Rated current: 0.5 A, Rated breaking 

capacity: 250 V AC 1,500 A / 250 V DC 

1,500 A (a UL certified product)

e

If MODBUS RTU devices do not have the 

SG terminal, the wiring between SG 

terminals is not necessary.

r

Install 120 

Ω

 terminating resistors between 

terminals ‘T/R+’ and ‘T/R-’ for devices at both 

ends of MODBUS RTU communication line.

*1 For low voltage circuits, it is not necessary 

to ground the VT and CT secondary sides.

*2 Do not connect the NC terminal.

r

e

w

q

1 2

K

L

k

l

U

V

u

v

Load

+C1

C1

+C2

C2

+C3

C3
P1
P2
P3
PN

T/R+

T/R-
SG
SLD

MA
MB

Protective

Earthing

MODBUS RTU

Communication

(+)
(−)

r

e

w

q

1 N

K

L

k

l

Load

+C1

C1

+C2

C2

+C3

C3
P1
P2
P3

PN

T/R+

T/R-
SG
SLD

MA

MB

Protective

Earthing

MODBUS RTU

Communication

(+)
(−)

3

K

L

k

l

MODBUS RTU

Communication

31

32

Содержание ME96 Series

Страница 1: ...FACTORY AUTOMATION ELECTRONIC MULTI MEASURING INSTRUMENT ME96SS ...

Страница 2: ...ures w ME96SSRB MB standard model ME96SSEB MB economy model e ME96SSEB MB economy model ME96SSHB MB high performance model 1 Supports highly accurate measurement accuracy of current voltage 0 1 active energy class 0 5S and high order harmonic measurement 1st to 31st 2 Incorrect wiring determination support function 3 Wide viewing angle LCD 4 Built in logging function 5 Display 4 items at the samet...

Страница 3: ...cautions 35 1 Analog pulse and alarm output unit Model ME 4210 SS96B 2 CC Link communication unit Model ME 0040C SS96 3 Digital input and output unit Model ME 0052 SS96 4 Data logging unit Model ME 0000BU SS96 5 MODBUS TCP communication unit Model ME 0000MT SS96 6 MODBUS TCP communication 2 port unit Model ME 0040MT2 SS96 Major features Remarks MODBUS RTU communication function provided as standar...

Страница 4: ...or RS485 USB converter RS485 MODBUS RTU USB MODBUS RTU communication system optimizes computer monitoring operations In addition when ME 0052 SS96 is installed remote monitoring of digital input signals and on off control of digital output signals are possible Therefore no other DI DO terminals are required Digital input signals can be latched for over 30 ms and there is no need for external latch...

Страница 5: ...from MODBUS RTU communication Optional module ME 0000BU SS96 can memorize the data of various quantities related to electricity measured by ME96SS Ver B for a certain period Therefore measurement data can be backup even when the MODBUS RTU communication of ME96SS Ver B fails Memorized measurement data can be output to an SD memory card in CSV format You can check the data files output to the SD me...

Страница 6: ...alue as well as max min values the display can be used for monitoring DISPLAY DISPLAY DISPLAY Special Display by Display Pattern P00 Display can be selected as desired Display Pattern P00 As the wide viewing angle LCD is mounted good visibility is obtained even when the instrument is mounted at a level lower than the eye line 1st to 3rd line Select from A DA V W var VA PF Hz 4th line Select from W...

Страница 7: ...rm generation No lower limit alarm on 0 A 0 V The use of the motor starting current mask function for monitoring the motor current can prevent updating of the maximum value and alarm output caused by the motor starting current Although the maximum value is not updated the current value is displayed The starting current mask time can be set in the range from 1 s to 5 min Starting current mask The m...

Страница 8: ... button operation Power consumption period 1 Power consumption period 2 Power consumption period 3 Rolling Demand Function Rolling demand is the estimated power consumption in a specified period interval For the block interval demand select the duration interval of the block to be used for demand calculation qRolling block Use rolling block to set the interval and sub intervals from 1 min to 60 mi...

Страница 9: ...s wPress the or button to change the analog output Note Default value is 0 0 1 2 49 50 pulse Note Default value is 0 pulses Normal state When incorrect wiring pattern cannot be detected When phase 1 CT is connected in reverse Incorrectly connected spot is displayed in blinking Incorrect wiring pattern No is displayed Note 1 When wiring of either one of the current voltage terminals is not correct ...

Страница 10: ...ging period 15 min 30 min 60 min Alarm log Time data at alarm generating cancellation and at waiting for alarm cancellation The recorded time of the Max Min value Max Min value data and time data Number of logging items Measuring data Integrated value data 5 items Data other than integrated value 15 items Total A maximum of 20 items Alarm log The number of the set alarms The recorded time of the M...

Страница 11: ...at the interval set at the data logging period 15 min 30 min 60 min Alarm log Time data at alarm generating cancellation and at waiting for alarm cancellation The recorded time of the Max Min value Max Min value data and time data Number of logging items Measuring data Integrated value data 5 items Data other than integrated value 15 items Total A maximum of 20 items Alarm log The number of the se...

Страница 12: ...D backlight The number of display digits or The number of segments Digital section First to Third line display 4 digits Fourth line display 6 digits A DA V W var VA PF 4 digits Hz 3 digits Wh varh VAh 9 digits 6 digit or 12 digit is also available Harmonic distortion ratio content rate 4 digits Harmonic RMS value 4 digits Operating time 6 digits Display update time interval 0 5 s 1 s selectable Co...

Страница 13: ... method Broadcast polling system Synchronous method Frame synchronous system Encoding method NRZI Transmission path format Bus format EIA RS485 Transmission format HDLC Error control system CRC X16 X12 X5 1 Number of connectable units 42 units max remote device station Remote station numbers station numbers 1 to 64 For CC Link connection cables please use the dedicated cables For information regar...

Страница 14: ...rnal memory logging period Detailed data Detailed data logging interval 1 min for 2 days Detailed data logging interval 5 min for 10 days Detailed data logging interval 10 min for 20 days Detailed data logging interval 15 min for 30 days Detailed data logging interval 30 min for 60 days 1 hour data 400 days about 13 months SD memory card 2 GB logging period 10 years or more System log data 1200 re...

Страница 15: ...rd or fast return of numerical values in numerical value setting Used to perform batch reset of all the max min values Used to change Wh etc to another unit and to low order zoom display Used to switch display between setting Used to switch display between max min values and instantaneous value Used to change over phase Used to change over the display screen Used to switch display between manual p...

Страница 16: ...se 4 wire To set 3 phase 3 wire or 1 phase 2 wire 1 For direct measurement without VT a 3 phase 4 wire setting phase voltage line voltage b 3 phase 3 wire 2CT 3CT or 1 phase 2 wire setting line voltage c 1 phase 3 wire setting 1N2 1N3 phase voltage line voltage SET SET 63 5 110 V 100 173 V 110 190 V 220 380 V 230 400 V 240 415 V 254 440 V 277 480 V no yES yES no 110 V 220 V 440 V 110 220 V 220 440...

Страница 17: ...96SSHB MB and ME96SSRB MB 1 Interval time limit 2 Sub interval time limit uSet the current demand time limit Select another set up menu or finish set up 63 5 V 100 V 110 V 115 V 120 V 100 V 110 V 220 V Factory default settings 3 phase 4 wire 200 V phase voltage 3 phase 3 wire 1 phase 2 wire 10 000 V line voltage Factory default setting 5 0 A Setting range 1 15 60 min Setting interval 1 min Setting...

Страница 18: ...m previous page To continue to set up Select the menu No using the or button To finish set up Press the or button to display the End screen then press the button to save settings SET Select another set up menu or end set up To continue to set up Select the menu No using the or button To finish set up Press the or button to display the End screen then press the button to save settings SET When MODB...

Страница 19: ...lowable IP addresses 000 000 000 000 192 168 3 10 255 255 255 255 rDetermine whether or not to use the default gateway of MODBUS TCP communication tSet the default gateway of MODBUS TCP communication When the default gateway is not used this window is not displayed Allowable default gateways 000 000 000 000 127 0 0 1 255 255 255 255 yIf settings relating to MODBUS TCP communication have been chang...

Страница 20: ...oFF Display Not display When you set to on Display harmonic measured values are displayed on the additional screen of display pattern Select another set up menu or end set up Adjust the set up menu No to 6 See the drawing on the right Clears logging data stored in the main body To continue to set up Select the menu No using the or button To finish set up Press the or button to display the End scre...

Страница 21: ...ated value Data 1 Data 2 Data 3 Data 4 Data 5 Data 6 Data 7 Data 8 Data 9 Data 10 Data 11 Data 12 Data 13 Data 14 Data 15 Wh imported Wh exported varh imported LAG varh imported LEAD VAh W total present value PF total present value Hz present value var total present value VA total present value A avg present value V line voltage avg present value DW last value Dvar last value DVA last value DW pea...

Страница 22: ...g output CH1 Select the measured item to be output from the table below Notes 1 The same measurement items can be set for all channels Notes 2 Measurement items not included in the selected display pattern can also be chosen Notes 3 Channels set to non will have minimum output 4 mA Additionally set up will proceed to the next channel Notes 4 Underlined specifications are factory default settings o...

Страница 23: ...nge Positive only Positive Negative 3 steps approx 120 0 steps 100 instrument rating 10 steps approx 40 Positive only Positive Negative 0 5 DISPLAY SET Set up menu yAnalog output limit The setting procedure is the same as that of qAnalog output CH1 output item rSet the output item for analog output CH2 4 The setting procedure is the same as that of wAnalog output CH1 detailed settings tSet the det...

Страница 24: ...p menu or end set up Set up menu 6 Logging setting only when ME 0000BU SS96 is installed Only for ME96SSHB MB or ME96SSRB MB it is applicable Set up menu SET DISPLAY SET wLogging ID DISPLAY SET rLogging item pattern DISPLAY SET qOptional selection DISPLAY SET eLogging data clear tDetailed data logging interval DISPLAY SET w q t e r Notes If the SD memory card contains data with the same logging ID...

Страница 25: ... value L N 3rd line Active power total 4th line Active energy imported 1st line Current Phase 1 2nd line Voltage Phase 1N 3rd line Active power Phase 1 4th line Active energy imported 1st line Current Phase 2 2nd line Voltage Phase 2N 3rd line Active power Phase 2 4th line Active energy imported 1st line Current Phase 3 2nd line Voltage Phase 3N 3rd line Active power Phase 3 4th line Active energy...

Страница 26: ...e the alarm For items with phases such as current and voltage it is necessary to press the button for each phase to cancel the alarm To cancel alarms for all items To cancel alarms for all items at once batch press the button for 2 s when in operating mode If an alarm delay time has been set alarm notification begins only when the measurement value exceeds the upper lower limit alarm value for a p...

Страница 27: ...4 The additional screen for Wh varh and VAh of P00 is not displayed unless Wh varh and VAh are set as the display elements ME96SSHB MB ME96SSRB MB Screen Display 3 phase 3 wire 1 phase 3 wire 1 phase 2 wire Display pattern Screen set based on display pattern No 1 No 2 No 3 No 4 No 5 No 6 P01 1st line A A A W A 2nd line V V V var DA 3rd line W var VA PF Hz 4th line Wh varh VAh Wh Wh P02 1st line A1...

Страница 28: ... wire 1 phase 2 wire Display pattern Screen set based on display pattern No 1 No 2 No 3 No 4 No 5 No 6 P01 1st line A A A W A 2nd line V V V var DA 3rd line W var VA PF Hz 4th line Wh varh VAh Wh Wh P02 1st line A1 DA1 V12 W A A 2nd line A2 DA2 V23 var Hz V 3rd line A3 DA3 V31 PF var VA 4th line Aavg DAavg Vavg Wh varh VAh P00 1st line Free 1 Free 1 Free 1 Free 1 2nd line Free 1 Free 1 Free 1 Free...

Страница 29: ...Memo 28 ...

Страница 30: ...cording to the following procedure qRemove the optional cover Fit the protruding part of the optional unit into the slot in the main unit Viewing angle 60 10 60 60 overhead view side view Viewing angle 60 60 60 60 overhead view side view Main unit mounting screws M3 92 0 5 0 92 0 5 0 ME96SSEB MB ME96SSHB MB ME96SSRB MB wAttach the optional unit to the main unit Optional Plug in Module ME 0000MT SS...

Страница 31: ...dation Rated current 0 5 A Rated breaking capacity 250 V AC 1 500 A 250 V DC 1 500 A a UL certified product eIf MODBUS RTU devices do not have the SG terminal the wiring between SG terminals is not necessary rInstall 120 Ω terminating resistors between terminals T R and T R for devices at both ends of MODBUS RTU communication line 1 For low voltage circuits it is not necessary to ground the VT and...

Страница 32: ...ng ME96SSRB MB ME96SSHB MB C1 C3 C2 C2 C1 C3 P1 P2 PN P3 MA MB SLD SG T R T R DI DI Digital input 1 DI1 DI1 DI2 DI2 DI3 DI3 DI4 DI4 DI5 DI5 DO1 DO1 DO2 DO2 Digital input 2 Digital input 3 Digital input 4 Digital input 5 24 V DC Digital output 1 Digital output 2 ME 0052 SS96 DI1 DI2 DI3 DI4 DI5 are connected inside Protective Earthing ME96SSRB MB ME96SSHB MB C1 C1 C2 C2 C3 C3 P1 P3 PN P2 T R T R SG...

Страница 33: ...lues according to the communication speed Not doing so may prevent normal communica tion see the CC Link Master Unit Operations Manual for information on dedicated lines and wiring conditions 8 The terminal resistance supplied with the CC Link Master Unit must always be used for the units at both ends of the CC Link communication line If the meter is at the end of the CC Link communication line co...

Страница 34: ...ion of energy saving system At first energy saving measurement can be started on a small scale from a desired place The system can be configured by adding units according to the increase of measuring circuits Leakage current monitoring Lineup of basic units for monitoring insulation Helpful in early detection of equipment problems through accurate leakage current trend monitoring by Ior method Ior...

Страница 35: ... match to the customer s usage environment Logging unit Data measured by the main unit current voltage power etc can be output to an SD memory card in CSV file format realizing simple data management Highly Accurate Measurements and Support Functions Customer activities are supported through functions such as 250 µs high precision short cycle load measurement operating time measurement wiring erro...

Страница 36: ...ion and or reduced service life Ambient temperature is outside the range of 5 C to 55 C Daily average temperature over 35 C Relative humidity over 85 RH non condensing Presence of excessive dust corrosive gas salt or oil smoke Product is subject to excessive vibration or shock Product is in direct contact with rain water drops or sunlight Altitude is above 2 000 m Excessive external noise Pollutio...

Страница 37: ...l collection recycling center The following symbol is printed on the package of ME 0000BU SS96 This symbol is applicable only in EU member states The symbol is designated in Article 20 Information for end users and Annex II of the new European Directive on batteries 2006 66 EC The above symbol indicates that the batteries must be disposed of after separation from general waste 10 Warranty Period T...

Страница 38: ... MEMO 37 ...

Страница 39: ... MEMO 38 ...

Страница 40: ...tries Ltd 26 Ophir Street IL 32235 Haifa Israel 972 0 4 867 0656 Italy Mitsubishi Electric Europe B V Viale Colleoni 7 I 20041 Agrate Brianza MI Italy 39 039 60531 Kazakhstan Kazpromavtomatika Ul Zhambyla 28 KAZ 100017 Karaganda 7 7212 501000 Korea Mitsubishi Electric Automation Korea Co Ltd 9F Gangseo Hangang xi tower A 401 Yangcheon ro Gangseo gu Seoul 07528 Korea 82 2 3660 9573 Laos AROUNKIT CO...

Отзывы: