6. Confirmation after Installation Work
After installation work is completed on the unit, follow the table below to perform inspection again. If there is a problem, be
sure to fix it.
Before a trial operation, be sure to confirm the following items and check the checkboxes.
□
Are the connection cables connected according to the connection diagram?
□
Is the connection load capacity within the maximum and minimum range?
□
Are the connection cables securely connected to the terminal block?
□
Are the connection cables arranged so that they are not touching the surface of the Lossnay unit control board?
□
Are any connectors on the circuit board disconnected?
□
Are the function settings set correctly?
7. Trial Operation
Conduct a trial operation following the installation and instruction manual for the Lossnay unit.
5. Function Settings
When PZ-62DR-E is used, the output signals from each terminal can be changed arbitrarily.
For how to change setting, please refer to the Lossnay installation and instruction manual.