4Basic operations
Handling the controller 4-44
4.1 Handling the controller
4.1.1 Names of each parts
4.1.2 CR800-05VD controller
Fig. 4-1 : Names of controller parts
<1> ACIN connector.......................................Socket used to connect the supplied ACIN cable (input voltage: 100 V AC/
200 V AC)
For the connection method, refer to
Page 8, "2.3.1 Connecting the power
cable and the grounding cable"
.
<2> PE terminal ................................................Terminals for grounding (M4 screw x 2).
<3> CN1 cable...................................................Machine cable connector.
<4> <5> CNUSR connector .........................Robot I/O cable connectors.
<4>: CNUSR11, <5>: CNUSR12
<6> TB connector............................................Dedicated connector for connecting T/B.
<7> LED ...............................................................Four LEDs indicating the controller status.
Number of
phase
ACIN cable
Single phase
Terminal: M5, cable length: 3m
LED
Details
POWER
Indicates the control power status.
On: Control power ON
Off: Control power OFF
Air intake for fan
Controller front
Controller rear
Air exhaust
Air exhaust
<1>
<2>
<3>
<6>
<5>
NO USE
<4>
<7> <8> <9> <10> <11> <12> <13> <14> <15> <16> <17>
<19>
<18>
<20>
<21>
㻸㻌㻔㻮㼘㼍㼏㼗㻕
㻺㻌㻔㼃㼔㼕㼠㼑㻕
㻲㻳㻌㻔㻳㼞㼑㼑㼚㻕
Содержание CR800-05VD
Страница 2: ......
Страница 70: ...5 61 Maintenance parts 5Maintenance and Inspection ...
Страница 71: ......