Mitsubishi Electric CMY-R100VBK Скачать руководство пользователя страница 3

(3) Routing the pipe through the bottom 

(1) Braze item 

7

high-pressure pipe to the stop valve so that the 

dimples on the pipe are parallel to the edge of the cutout hole.
Expand the end of the field-supplied pipes, and braze them
to item 

7

high-pressure pipe. 

(2) Attach item 

1

low-pressure twinning kit to the sheet metal of the 

control valve with item 

3

screw, and braze it to the control valve. 

(3) Braze item 

5

or 

6

elbow pipe to the field-supplied pipe first, 

and then braze it to item 

1

low-pressure twinning kit. 

(4) Flare the field-supplied pipe end, and braze the pipe to the 

low-pressure pipe in the middle.

(5) Wrap the pipe in front of item 

1

low-pressure twinning kit with item 

9

pipe cover, and attach compressor cables to item 

9

pipe cover with 

item 

M

cable tie to keep them out of direct contact with the pipes. 

Twinning pipe on the high-pressure side 

±

15

˚

Slope of the twinning pipe is at an angle within 

±

15˚ to the horizontal plane.

Note. Refer to the figure below for the installation position of the twinning pipe. 

3

(4) Routing the pipe through the front 

(1) Braze item 

8

high-pressure pipe to the control valve. 

(2) Attach item 

1

low-pressure twinning kit to the sheet metal of the

control valve with item 

3

screw, and braze it to the control valve. 

(3) Braze item 

5

or 

6

elbow pipe to the field-supplied pipe first, 

and then braze it to item 

low-pressure twinning kit. 

(4) Braze either item 

4

or 

5

elbow pipe to the low-pressure pipe in 

the middle. 

(5) Wrap the pipe in front of item 

1

low-pressure twinning kit with 

item  

9

pipe cover, and attach compressor cables to item 

9

pipe 

cover with item 

M

cable tie to keep them out of direct contact 

with the pipes. 

1

3

5

,

6

Field-supplied pipes 

Field-supplied 

pipes 

Connect the pipe so that the 
dimples on the 

7

 high pressure 

pipe are on an imaginary line 
parallel to the edge of the 
cutout hole. 

9

Wrap the pipe cover here. 
Attach compressor cables to 
Pipe cover with Cable tie 
to keep them out of direct 
contact with the pipes. 

1

3

5

,

6

4

,

5

8

Field-supplied pipes 

9

Wrap the pipe cover here. 
Attach compressor cables to 
Pipe cover with Cable tie 
to keep them out of direct 
contact with the pipes. 

· Before heating the pipes, place a wet towel on the control valve to  

keep its temperature below 120 ˚C [248˚F]. 

· Direct the flame away from the cables and sheet metals inside the 

unit so as not to burn them. 

CAUTION

· Before heating the pipes, place a wet towel on the control valve to  

keep its temperature below 120 ˚C [248˚F]. 

· Direct the flame away from the cables and sheet metals inside the 

unit so as not to burn them. 

CAUTION

(2) Low-pressure twinning kit in CMY-R100VBK 

Use either 

F

or 

G

in table 1,(1) Package Contents

depending on the size of the pipe at the control valve on
the unit to be combined with. Attach items 

H

I

, and 

J

to the stop valve sheet metal and then to the low-pressure
twinning kit to hold it into place. 

1. Attach item 

J

to the stop valve sheet metal.

2. Attach the packing and saddle.
3. Secure the low pressure twinning kit.

F

 or 

G

1

H

,

I

,

J

3

3

Section to be brazed field-supplied

Stop valve

(5) Slope of twinning pipes (high-pressure side only) 

Make sure the slope of the twinning pipes are at an angle 
within ±15˚ to the horizontal plane.
If the slope exceeds the specified angle, the unit may be 
damaged. 

Содержание CMY-R100VBK

Страница 1: ...r alterations Consult your dealer for repair Improper installation may result in water leakage electric shock or fire In the event of a refrigerant leak thoroughly ventilate the room If refrigerant leaks and comes in contact with an open flame toxic gases will be generated Properly install all parts according to the instructions in the Installation Manual If the wrong twinning pipe or wrong size c...

Страница 2: ...P72 P96 P96 P120 D0 CMY R100VBK CMY R200VBK CMY R100VBK CMY R100VBK CMY R100VBK F0 Twinning pipe Outdoor unit Low pressure E or F A3 B3 C3 D3 E3 PURY YHM PURY YHMU PURY THMU A1 A2 A3 P200 Ø15 88 Ø19 05 EP200 Ø15 88 Ø19 05 P72 Ø15 88 Ø19 05 P72 Ø15 88 Ø19 05 B1 B2 B3 P250 Ø19 05 Ø22 2 EP300 Ø19 05 Ø22 2 P96 Ø19 05 Ø22 2 P96 Ø19 05 Ø22 2 C1 C2 C3 P300 Ø19 05 Ø22 2 A P120 Ø19 05 Ø28 58 P120 Ø19 05 Ø2...

Страница 3: ...e cover and attach compressor cables to item 9 pipe cover with item M cable tie to keep them out of direct contact with the pipes 1 3 5 6 Field supplied pipes Field supplied pipes Connect the pipe so that the dimples on the 7 high pressure pipe are on an imaginary line parallel to the edge of the cutout hole 9 Wrap the pipe cover here Attach compressor cables to Pipe cover with Cable tie to keep t...

Страница 4: ... 2High pressure twinning pipe LInsulation cover Tape field supplied To be gap free To be gap free 4 See reverse 3 Pipe Connection Example Connect the pipes between outdoor units using the figure below as a reference Main low pressure pipe field supplied Main high pressure pipe field supplied 2High pressure twinning pipe Low pressure connecting pipe field supplied High pressure connecting pipe fiel...

Отзывы: