OPERATING PROCEDURE
PHOTOS/FIGURES
12.
Removing the drain pump (DP)
(1) Remove the drain pan. (Refer to procedure 10)
(2) Cut the hose band and remove the hose.
(3) Loosen the clamp of the drain pump.
(4) Remove the drain pump (tapping screw 4×10: 2 screws/2
hooks).
(5) Cut the drain pump base and lead wire fixing band.
(See Figure 5)
(6) Remove the lead wire of the drain pump from the clamp
of the drain pump base. (See Figure 5)
(7) Remove the drain pump (tapping screw: 3 screws).
(See Figure 6)
Photo 15
Figure 6
Figure 5
Drain pump
Float switch
Clamp
Hose band
Float switch
fixing screw
Drain pump base
fixing screws
Drain pump base and lead wire fixing band
Clamp of the drain
pump base
Tapping screws