4.  Fixing hanging bolts

4.1.   Fixing hanging bolts

[Fig. 4.1.1] (P.3)

(Give site of suspension strong structure.)

Hanging structure

•     Ceiling: The ceiling structure varies from building to one another. For detailed

information, consult your construction company.

•     If necessary, reinforce the hanging bolts with anti-quake supporting members as

countermeasures against earthquakes.
* Use M10 for hanging bolts and anti-quake supporting members (field supply).

Center of gravity and Product Weight

The values in the parenthesis are for the PEFY-M·VMAL-A1 model.

5. Installing the unit

5.1.   Hanging the unit body



Bring the indoor unit to an installation site as it is packed.



To hang the indoor unit, use a lifting machine to lift and pass through the

hanging bolts.

[Fig. 5.1.1] (P.3)

[Fig. 5.1.2] (P.3)

5.2.   Confirming the unit’s position and fixing hanging 

bolts



Ensure

 

that the hanging bolt nuts are tightened to fix the hanging bolts.



To ensure that drain is discharged, be sure to hang the unit at level using

a level.

Caution:

Install the unit in horizontal position. If the side with drain port is installed
higher, water leakage may be caused.

6. Refrigerant pipe and drain pipe specifications

To avoid dew drops, provide sufficient antisweating and insulating work to the
refrigerant and drain pipes.
When using commercially available refrigerant pipes, be sure to wind commercially
available insulating material (with a heat-resisting temperature of more than 100 °C
and thickness given below) onto both liquid and gas pipes.
Insulate all indoor pipes with form polyethylene insulation with a minimum density of
0.03 and a thickness as specified in the table below.

1

Select the thickness of insulating material by pipe size.

2

If the unit is used on the highest story of a building and under conditions of

 

high

temperature and humidity, it is necessary to use pipe size and insulating material’s
thickness more than those given in the table above.

3

If there are customer’s specifications, simply follow them.

6.1.   Refrigerant pipe and drain pipe specifications

6.2.   Refrigerant pipe, drain pipe

[Fig. 6.2.1] (P.3)

A  

Center of gravity

Model name

W

L

X

Y

Z

Product Weight (kg)

PEFY-M20VMA(L)-A1

643

754

330

300

130

21.0 (20.0)

PEFY-M25VMA(L)-A1

643

754

330

300

130

21.0 (20.0)

PEFY-M32VMA(L)-A1

643

754

330

300

130

21.0 (20.5)

PEFY-M40VMA(L)-A1

643

954

340

375

130

25.0 (24.5)

PEFY-M50VMA(L)-A1

643

1154

325

525

130

30.0 (29.0)

PEFY-M63VMA(L)-A1

643

1154

325

525

130

30.0 (29.0)

PEFY-M71VMA(L)-A1

643

1454

330

675

130

37 (36)

PEFY-M80VMA(L)-A1

643

1454

330

675

130

37 (36)

PEFY-M100VMA(L)-A1

643

1454

330

675

130

37 (36)

PEFY-M125VMA(L)-A1

643

1454

330

675

130

38 (37)

PEFY-M140VMA(L)-A1

643

1654

332

725

130

42 (41)

A  

Unit body

B  

Lifting machine

C  

Nuts (field supply)

D  

Washers (field supply)

E  

M10 hanging bolt (field supply)

Pipe size

Insulating material’s thickness

6.4 mm to 25.4 mm

More than 10 mm

28.6 mm to 38.1 mm

More than 15 mm

PEFY-M·VMA(L)-A1

20·25·32·40·50

63·71·80·100·125·140

Refrigerant pipe

(Brazing connection)

Liquid pipe

ø 6.35

ø 9.52

Gas pipe

ø 12.7

ø 15.88

Drain pipe

O.D. ø 32

Item

Model

A  

Refrigerant pipe (liquid pipe)

B  

Refrigerant pipe (gas pipe)

C  

Drain pipe (O.D. ø32)

D  

Drain pipe (O.D. ø32, spontaneous draining)

01_KJ79P971H02_en.book  10 ページ  2022年7月5日 火曜日 午前11時38分

Содержание CITY MULTI PEFY-M100VMA-A1

Страница 1: ...uftkonditioneringsenheten installeras för säker och korrekt användning bg pl no tr MONTAJ ELKİTABI Emniyetli ve doğru biçimde nasıl kullanılacağını öğrenmek için lütfen klima cihazını monte etmeden önce bu elkitabını dikkatle okuyunuz РЪКОВОДСТВО ЗА МОНТАЖ За безопасна и правилна употреба моля прочетете внимателно това ръководство преди монтажа на климатизатора PODRĘCZNIK INSTALACJI W celu bezpiec...

Страница 2: ... S 50 50 P 700 Min 300 mm G H K F A I Viewed from the direction of the arrow B A Electric box B Ceiling C Ceiling beam D Access door 2 450 mm x 450 mm E Access door 1 450 mm x 450 mm F Maintenance access space G Supply air H Intake air I Bottom of indoor unit J Access door 3 K Access door 4 mm Model P Q R S PEFY M20 25 32VMA L A1 700 50 150 800 1300 PEFY M40VMA L A1 900 150 250 1000 1500 PEFY M50 ...

Страница 3: ...Lifting machine C D C E D C Nuts field supply D Washers field supply E M10 hanging bolt field supply 137 67 239 357 122 33 41 217 C A B D A Refrigerant pipe liquid pipe B Refrigerant pipe gas pipe C Drain pipe O D ø32 D Drain pipe O D ø32 spontaneous draining 01_KJ79P971H02_en book 3 ページ 2022年7月5日 火曜日 午前11時38分 ...

Страница 4: ... Make it as large as possible About 10 cm F Indoor unit G Make the piping size large for grouped piping H Downward slope 1 100 or more I O D ø38 PVC TUBE for grouped piping 9 mm or more insulation PEFY M VMA A1 model J Up to 700 mm N Drain socket accessory O Horizontal or slightly upgradient B C D D G F E H A 32 35 25 A Indoor unit B Tie band accessory C Visible part D Insertion margin E Drain soc...

Страница 5: ...door D Canvas duct E Ceiling surface F Air outlet G Leave distance enough to pre vent short cycle H Min 200 mm A B A Filter B Bottom plate C Nail for the bottom inlet D Nail for the rear inlet A B C C C C D C 220V TB5 TB15 TB5 TB15 S M1M2 S M1M2 TB3 M1M2 2 1 2 1 A A B C C TB5 TB5 S M1M2 S M1M2 TB3 M1M2 A A B C C A Terminal block for indoor transmission cable B Terminal block for outdoor transmissi...

Страница 6: ...cure the cable G Power source wiring H Use ordinary bushing I Transmission wiring C Terminal box D Knockout hole E Remove E D C J L K J Terminal block for power source K Terminal block for indoor transmission L Terminal block for remote controller M2 S M1 A B C E D A Terminal block B Round terminal C Shield wire D The earth wire from two cables are connected together to the S terminal Dead end con...

Страница 7: ...s repaired improperly water leakage electric shock or fire may result Do not touch the heat exchanger fins Improper handling may result in injury When handling this product always wear protective equipment EG Gloves full arm protection namely boiler suit and safety glasses Improper handling may result in injury If refrigerant gas leaks during installation work ventilate the room If the refrigerant...

Страница 8: ...eriorate Store the piping to be used during installation indoors and keep both ends of the piping sealed until just before brazing Store elbows and other joints in a plastic bag If dust dirt or water enters the refrigerant cycle deterioration of the oil and compressor trouble may result Use liquid refrigerant to fill the system If gas refrigerant is used to seal the system the composition of the r...

Страница 9: ...ceiling is at high temperature high humidity due point above 26 C due condensation may be produced in the indoor unit When operating the units in this condition add insulation material 10 20 mm to the entire surface of the indoor unit to avoid due condensation 3 1 Install the indoor unit on a ceiling strong enough to sustain its weight Warning The unit must be securely installed on a structure tha...

Страница 10: ... all indoor pipes with form polyethylene insulation with a minimum density of 0 03 and a thickness as specified in the table below 1 Select the thickness of insulating material by pipe size 2 If the unit is used on the highest story of a building and under conditions of high temperature and humidity it is necessary to use pipe size and insulating material s thickness more than those given in the t...

Страница 11: ...y trap or irregularity on the way Ensure that any cross wise drain piping is less than 20 m excluding the difference of elevation If the drain piping is long provide metal braces to prevent it from waving Never provide any air vent pipe Otherwise drain may be ejected Use a hard vinyl chloride pipe VP 25 with an external diameter of 32 mm for drain piping Ensure that collected pipes are 10 cm lower...

Страница 12: ...tdoor unit no auxiliary devices which may be a potential ignition source are installed in the duct work only auxiliary devices approved by the manufacturer are used in the duct work an air inlet or outlet is connected directly with a room by ducting Do NOT use spaces such as a false ceiling as a duct for the air inlet or outlet Do NOT install operating ignition sources example open flames an oper ...

Страница 13: ...5 Apply to IEC61000 3 3 about Max Permissive System Impedance 1 The Ground fault interrupter should support Inverter circuit The Ground fault interrupter should combine using of local switch or wiring breaker 2 Please take the larger of F1 or F2 as the value for F0 F1 Total operating maximum current of the indoor units 1 2 F2 V1 Quantity of Type1 C V1 Quantity of Type2 C V1 Quantity of Type3 C V1 ...

Страница 14: ...ht and under tension Wiring under tension may break or overheat and burn 9 3 Connecting electrical connections Please identify the model name of the operation manual attached on the terminal box cover with that shown on the rating name plate 1 Remove the screw 1pc holding the cover to dismount the cover Fig 9 3 1 P 6 2 Open knockout holes Recommend to use a screwdriver or the like for this work Fi...

Страница 15: ...and branch numbers at will The determination of indoor unit addresses varies with the system at site Set them referring to the Data Book 9 7 Sensing room temperature with the built in sensor in a remote controller If you want to sense room temperature with the built in sensor in a remote controller set SW1 1 on the control board to ON The setting of SW1 7 and SW1 8 as necessary also makes it possi...

Страница 16: ...EFY M20VMA L A1 220 240 V 50 Hz Max 264 V Min 198 V 0 93 0 085 0 74 PEFY M25VMA L A1 0 93 0 085 0 74 PEFY M32VMA L A1 1 19 0 085 0 95 PEFY M40VMA L A1 1 53 0 121 1 22 PEFY M50VMA L A1 2 13 0 121 1 70 PEFY M63VMA L A1 2 20 0 121 1 76 PEFY M71VMA L A1 2 35 0 300 1 88 PEFY M80VMA L A1 2 35 0 300 1 88 PEFY M100VMA L A1 2 81 0 300 2 25 PEFY M125VMA L A1 2 93 0 300 2 34 PEFY M140VMA L A1 3 29 0 300 2 63...

Страница 17: ...01_KJ79P971H02_en book 17 ページ 2022年7月5日 火曜日 午前11時38分 ...

Страница 18: ...01_KJ79P971H02_en book 18 ページ 2022年7月5日 火曜日 午前11時38分 ...

Страница 19: ...L NO YEAR OF MANUFACTURE kg WEIGHT IP CODE IP20 4 15MPa kW R32 R410A 10 DC30V REFRIGERANT FAN MOTOR ALLOWABLE PRESSURE CONTROL RATING ALLOWABLE VOLTAGE SERVICE REF MODEL AIR CONDITIONER INDOOR UNIT COOLING RATED CURRENT RATED INPUT FREQUENCY RATED VOLTAGE V Hz OPERATE CAPACITY kW kW A HEATING 220 230 240 220 230 240 50 50 50 50 50 50 01_KJ79P971H02_en book 27 ページ 2022年7月5日 火曜日 午前11時38分 ...

Страница 20: ...al commercial and light industrial environment Please be sure to put the contact address telephone number on this manual before handing it to the customer HEAD OFFICE TOKYO BLDG 2 7 3 MARUNOUCHI CHIYODA KU TOKYO 100 8310 JAPAN 01_KJ79P971H02_en book 34 ページ 2022年7月5日 火曜日 午前11時38分 ...

Отзывы: