[
V
Wiring Diagram ]
- 21 -
HWE19070
GB
2. PEFY-M20, 25, 32, 40, 50, 63, 71, 80, 100, 125VMA2-A
DC280-340V
Rectifier circuit
SYMBOL
SYMBOL
EXPLANA
TION
NAME
SYMBOL
NAME
SYMBOL
NAME
5 6
7
8
9
0
1
2
3
4
0
9
8
7
6
5
4
3
2
1
0
8
7
6
5
4
3
2
1
F
E
D
C
B
A
9
OFF
ON
CND
(Red)
CNMF1
INSIDE SECTION OF CONTROL
BOX
SWE
3
CNP
LED1
POWER SUPPL
Y
AC220,230,240V
50Hz
3
1
7
CN2M
1
1
1
CN3A
3
SW12
(10ths digit)
SW1
SW2
SW3
SW4
SW21
SW22
CN20
(Red)
6
CN60
4
3
2
1
DP
M
3~
LEV
M
(SHEILD)
TB5
T
O
NEXT
INDOOR UNIT
BREAKER(16A)
FUSE(16A)
PULL
BOX
T
O
MA
REMOTE
CONTROLLER
T
O
OUTDOOR UNIT
BC CONTROLLER
REMOTE CONTROLLER
MF
M
3~
1
CNACL
(Black)
SA
U
U
ZNR001
ZNR002
F1
CN51
CN52
(Green)
CN32
(Blue)
(Blue)
CN105
(Red)
SW1
1
(1s digit)
SW14
(BRANCH No.)
LED2
CN90
FS
3
CN44
4
12
TH22
34
12
CN2A
(Black)
ACL
I.B.
CN41
12
41
3
5
2
CN27
(Red)
F2
CN22
(Green)
CN4F
TH23
TH21
5
6
741
5
6
21
ACL
AC reactor(Power factor improvement)
Drain Pump
Float switch
Power source terminal block
Tr
ansmission terminal block
Tr
ansmission terminal block
Thermistor (inlet air temp. detection)
Thermistor (piping temp.detection/liquid)
Thermistor (piping temp.detection/gas)
DP
FS
TB2
TB5
TB15
TH21
TH22
TH23
CN2A
Connector (0-10V
Analog input)
CN32
Connector (Remote switch)
CN41
Connector (HA
terminal-A)
CN51
Connector (Centrally control)
CN52
Connector (Remote indication)
CN90
Connector (Wireless)
CN105
Connector (IT
terminal)
SW1
Switch (for mode selection)
SW2
Switch (for capacity code)
SW3
Switch (for mode selection)
SW14
Switch (BRANCH No.)
SW21
Switch (for static pressure selection)
SW22
Switch (Wireless pair No.)
SWE
Connector (emergency operation)
LED1
LED(Power supply)
LED2
LED(Remote controller supply)
SA
Arrester
F1
Fuse AC250V
6.3A
ZNR001,002
V
aristor
SW4
Switch (for model selection)
SW1
1
Switch (1s digit address set)
SW12
Switch (10ths digit address set)
I.B.
Indoor controller board
I.B.
Indoor controller board
Linear expansion valve
LEV
Fuse DC400V 3A
F2
CN27
Connector (Damper)
Fan Motor
MF
CN22
Connector (Optional
Thermistor)
NOTE)1.Symbols used in wiring diagram are
: Connector
, :
T
e
rminal,
(Heavy dotted line) : Field wiring,
2.Have all electric work done by a licensed electrician
according to the local regulations.
3.Earth leakage circuit breaker should be set up on the wiring
of the power supply
.
4.T
o perform a drainage test for the drain pump turn on the SWE
on the control board while the indoor unit is being powered.
*Be sure to turn of
f the SWE after completing a drainage test or test run.
L
N
TB2
M1
M2
S
2
TB15
t°
t°
t°
HWE19070.book Page 21 Thursday, September 12, 2019 3:46 PM
Содержание City Multi PEFY-M100VMA-A
Страница 1: ......
Страница 5: ...iv HWE19070 GB HWE19070 book Page iv Thursday September 12 2019 3 46 PM ...
Страница 7: ...HWE19070 GB HWE19070 book 2 ページ 2019年9月17日 火曜日 午前9時38分 ...
Страница 46: ......