3 PROCEDURES BEFORE OPERATION
27
3
3
PROCEDURES BEFORE OPERATION
This chapter describes the procedures before operation.
1.
Installation
Mount the IO-Link module. (
Page 33 INSTALLATION AND WIRING)
2.
Wiring
Wire a power supply, an Ethernet cable, and an external device to the IO-Link module. (
3.
Station number setting
Power on the IO-Link module and set the station number. (
Page 18 Network configuration)
4.
CC-Link IE Field Network parameter setting
Connect an engineering tool to the CC-Link IE Field Network master station and configure the CC-Link IE Field Network
parameters. (
Page 45 CC-Link IE Field Network Parameter Setting)
5.
IO-Link module parameter setting
Use an engineering tool to configure the IO-Link module parameters. (
Page 47 IO-Link Module Parameter Setting)
6.
Programming
Create a program. (
To replace the IO-Link module, follow the procedure described below.
• Turn off the IO-Link module power supply and remove the IO-Link module.
• Prepare a new IO-Link module and perform the above procedure for wiring, parameter setting, and
programming. (The network parameters of the CC-Link IE Field Network master station do not need to be
set again.)
• After checking the operation, restart the control.
Содержание CC-Link IE Field NZ2GF12A-60IOLH8
Страница 1: ...CC Link IE Field Network Waterproof Remote IO Link Module User s Manual NZ2GF12A 60IOLH8 ...
Страница 2: ......
Страница 30: ...28 3 PROCEDURES BEFORE OPERATION MEMO ...
Страница 100: ...98 8 MODULE FUNCTION BLOCKS MEMO ...
Страница 109: ...9 PROGRAMMING 9 2 Program Example of Setting Parameters Using a Dedicated Instruction 107 9 ...
Страница 116: ...114 9 PROGRAMMING 9 3 Example of Program to Communicate with an IO Link Device ...
Страница 118: ...116 10 MAINTENANCE AND INSPECTION MEMO ...
Страница 155: ...APPX Appendix 7 Additional or Changed Functions 153 A MEMO ...
Страница 157: ...I 155 MEMO ...
Страница 161: ......