background image

BC29

 

B

ATTERY 

C

ABINET

 

 
4/16/2014 

 

10 

755-00087 R03 

4.

 

I

NSPECTION 

U

PON 

R

ECEIPT OF 

G

OODS

 

4.1

 

G

ENERAL

 

Special precautions and care have been taken to ensure the system arrives safe and undamaged. 
However, upon receipt, you should inspect the entire shipment, including the crate and any boxes 
for evidence of damage that may have occurred during transit. 
 

4.2

 

V

ISIBLE 

D

AMAGE

 

It  is  the  responsibility  of  the  person  receiving  the  shipment  to  inventory  and  fully  inspect  all 
materials against the bill of lading or weigh bill IMMEDIATELY while the carrier representative 
is still present. Insure that all items are accounted for, including number of skids and quantity of 
boxes.  Also  note  any  visible  external  damage  that  may  have  occurred  during  transit.  Make  all 
applicable  notations  on  the  delivery  receipt  before  signing  and  file  a  damage  report  with  the 
carrier. 
 

4.3

 

C

ONCEALED 

D

AMAGE

 

Within  3  to  30  days  of  receipt  (depending  on  courier),  unpack  the  system  and  check  for  any 
concealed  damage.  Check  the  materials  received  against  the  detailed  packing  list  to  verify  the 
quantity and the condition as complete and satisfactory. 
 
Note  any  damage  to  the  internal  packaging,  then  request  an inspection  by  the  carrier  and  file  a 
concealed damage claim. If there is a material shortage, contact a C&C Power representative at 
the main office to file a claim. 
 

Please contact your shipping company for all shipping damage. 

C&C Power is not responsible for any shipping damage. 

 

4.4

 

R

ETURN OF 

D

AMAGED 

G

OODS

 

Should equipment be damaged and require return to C&C Power for repair, a representative will 
provide instructions along with an RMA number to expedite the return. 
 

A RMA number must be obtained before returning equipment to C&C Power, Inc. 

 

Содержание C&C Power BC29

Страница 1: ...Mitsubishi Electric Power Products Inc BC29 Battery Cabinet Installation Operation Maintenance Manual Built for Mitsubishi Electric Power Products Inc by ...

Страница 2: ...4 16 2014 2 755 00087 R03 ...

Страница 3: ...er Products Inc for use in conjunction with equipment provided by C C Power Inc unauthorized reproduction in whole or in part without written permission of C C Power Inc is prohibited Copyright 2014 C C Power Inc All rights reserved C C Power Inc 395 Mission Street Carol Stream IL 60188 www ccpower com Technical Support Phone 630 617 9022 Email support ccpower com ...

Страница 4: ...4 16 2014 4 755 00087 R03 ...

Страница 5: ...em Specifications 12 6 1 Batteries 12 6 2 System Grounding 12 6 3 DC Output 12 6 4 General Specifications 13 7 Installation 14 7 1 Preparation 14 7 1 1 Equipment Inspection 14 7 1 2 Necessary Equipment and Tools 14 7 1 3 Installation Safety Precautions 14 7 2 Installation Steps 15 7 2 1 Equipment Location 15 7 2 2 Equipment Mounting 15 7 2 3 Equipment Grounding 15 7 2 4 DC Connections 16 7 2 5 Sys...

Страница 6: ...e of the system 1 1 MANUAL SYMBOLS Warning Indicates information provided to protect the user against personal injury and or safety hazards Caution Indicates information provided to protect the user against safety hazards and or possible equipment damage Important Indicates information provided as an installation or operating instruction or tip as well as general important installation and system ...

Страница 7: ...cabinet system is Hi Pot tested to UL standards at our facility prior to shipment Sales support for future equipment needs or upgrades is provided by our regional sales staff and qualified representatives All technical questions and service issues should be directed to our main office by dialing the number listed below This is a 24 hour 7 day service number After normal working hours please leave ...

Страница 8: ...to install or service this equipment System installation and maintenance should always be performed with heavily insulated tools It is also recommended to wear rubber gloves boots and use insulating mats to stand on when working on this equipment Always wear eye protection when installing or maintaining batteries and or power equipment Battery cabinet systems are extremely heavy Use a minimum of t...

Страница 9: ...moved prior to installing or servicing this system Do not open or mutilate batteries Opened or severely damaged batteries can release toxic electrolyte which is harmful to the skin and eyes Never lay loose cables metal parts or tools on top of batteries Under certain conditions batteries can vent potentially explosive gas hydrogen Never enclose batteries or battery cabinets in a sealed room ...

Страница 10: ...able notations on the delivery receipt before signing and file a damage report with the carrier 4 3 CONCEALED DAMAGE Within 3 to 30 days of receipt depending on courier unpack the system and check for any concealed damage Check the materials received against the detailed packing list to verify the quantity and the condition as complete and satisfactory Note any damage to the internal packaging the...

Страница 11: ... fails the batteries will discharge in order to provide the necessary backup power to the load It is the responsibility of the customer to make sure the batteries are not discharged below manufactures recommendations After any battery discharge has occurred the batteries should be recharged as soon as possible Batteries will be damaged if not properly recharged right away See the UPS manual for mo...

Страница 12: ...ound wire should be sized per NEC and or all applicable national and local codes Battery Cabinet Breaker or Fuse Size Minimum Copper Ground Wire Size Up to 200 amps 6 AWG 201 300 amps 4 AWG 301 400 amps 3 AWG 401 500 amps 2 AWG 501 600 amps 1 AWG 6 3 DC OUTPUT Please refer to system drawings for model specific information Voltage 12 480 VDC Nominal Circuit Breaker UL Listed 600 VDC rated See syste...

Страница 13: ...ur inches is required in front and behind the cabinet This refers to obstruction of ventilation only Clearance around the equipment should be as suggested by NEC and or all applicable national and local codes Wire should be sized for a maximum voltage drop of 0 5 volt Under certain conditions batteries can vent potentially explosive gas hydrogen Never enclose batteries or battery cabinets in a sea...

Страница 14: ...ent of hand tools o Digital voltmeter 7 1 3 INSTALLATION SAFETY PRECAUTIONS Before proceeding with system installation be sure to review and understand all of the SAFETY PRECAUTIONS in this manual DC VOLTAGE WARNING Hazardous DC voltages are present in the system This hazard will always be present in a battery system including when it is offline Accidental short circuit of the positive and negativ...

Страница 15: ... the cabinet and prevent it from moving 7 2 3 EQUIPMENT GROUNDING Terminate a cabinet ground wire from the main building ground source to the supplied 6 300MCM mechanical lug located on the breaker pan See section 6 2 for sizing recommendations Wire should be sized per NEC and or all applicable national and local codes Before installing or maintaining this system it is extremely important to read ...

Страница 16: ...Review the supplied cabinet drawing for information on the battery cabinet output All cables should be sized per NEC and any other local codes pertaining to this equipment Refer to the UPS or charger manual for wiring external batteries Note Make sure any charging source is disconnected before making these connections 5 Connect the cable that was left off during shipment and install as shown on th...

Страница 17: ...e Make sure new battery is installed properly regarding polarity orientation Use the supplied wiring drawing found inside the battery cabinet door to verify the cabinet wiring 10 Reconnect the cables to battery and make sure the connections are properly torqued Before proceeding with system maintenance be sure to review and understand all of the SAFETY PRECAUTIONS in this manual Verify that the ou...

Страница 18: ...t any removed string jumpers and make sure the connections are properly torqued 12 Check the battery string voltage at input side of the circuit breaker 13 Reconnect the UPS to the battery string by turning on closing the circuit breaker in the battery cabinet ...

Страница 19: ...BC29 BATTERY CABINET 4 16 2014 19 755 00087 R03 9 REFERENCE MATERIALS ...

Страница 20: ...BC29 BATTERY CABINET 4 16 2014 20 755 00087 R03 ...

Страница 21: ...BC29 BATTERY CABINET 4 16 2014 21 755 00087 R03 ...

Страница 22: ... injury to person or property or any other incidental or consequential loss is available This LIMITED WARRANTY shall not be deemed to have failed of its essential purpose so long as C C Power Inc is willing and able to repair or replace defective parts in the manner prescribed in this LIMITED WARRANTY Certain integrated products which are not manufactured by C C Power will be warranted by the appl...

Страница 23: ...C C Power Inc 395 Mission Street Carol Stream IL 60188 Phone 630 617 9022 www ccpower com ...

Отзывы: