32
4.7 Check for state of connection (line test)
After connecting all modules including the AJ65BT-RPI-10A/10B, check
whether the CC-Link system can establish proper data links or not.
To perform the line test of the AJ65BT-RPI-10A/10B module, use the
line test 2 of the master module. For the line test 2 of the master
module, refer to the User's Manual of the applicable master module.
Perform the test following the steps shown below.
Содержание AJ65BT-RPI-10A
Страница 52: ...37 MEMO ...
Страница 53: ......