(N) Operation via communication and its settings
71
2
GROUP
N
Instructions
Operating and handling instructions
• The inverter only accepts the commands from the programmable controller during operation using the CC-Link IE Field
Network Basic.
The run command from external and parameter unit is ignored.
• If multiple inverters have the same station number, the communication cannot be performed properly.
• The inverter protective function (E.EHR) is activated if data communication stops for more than the time set in
Pr.1432
Ethernet communication check time interval
due to a fault such as a programmable controller fault or a break in the
Ethernet cable, during operation through the CC-Link IE Field Network Basic.
• If the programmable controller (master station) is reset during operation through the CC-Link IE Field Network Basic or
if the programmable controller is powered off, data communication stops and the inverter protective function (E.EHR) is
activated.
To reset the programmable controller (master station), switch the operation mode to the external operation once, then
reset the programmable controller.
• When
Pr.340
= "0 (initial value)", any inverter whose main power is restored is reset to return to the external operation
mode. To resume the network operation, therefore, set the operation mode to the network operation using the
programmable controller program.
Set a value other than "0" in
Pr.340
to start in the network operation mode after inverter reset. (For the details of
Pr.340
,
refer to the Instruction Manual (Detailed) of the FR-A800/FR-F800 inverter.)
Troubleshooting
Parameters referred to
Pr.37 Speed display, Pr.144 Speed setting switchover
Instruction Manual (Detailed) of the FR-A800/FR-F800 inverter
Pr.811 Set resolution switchover
Instruction Manual (Detailed) of the FR-A800 inverter
Description
Check point
Operation mode does not switch
to the network operation mode
Check that the Ethernet cable is installed correctly. (Check for a fault such as a contact fault or break in
the cable.)
Check that the inverter is in the External operation mode.
Check that the operation mode switching program is running.
Check that the operation mode switching program has been written correctly.
Inverter does not start in the
Network operation mode
Check that the inverter starting program is running.
Check that the inverter starting program has been written correctly.
Check that
Pr.338 Communication operation command source
is not set to external.