34
Control circuit specifications
2.3.5
Mounting the operation panel (FR-DU07) on the enclosure surface
Having an operation panel on the enclosure surface is convenient. With a connection cable, you can mount the
operation panel (FR-DU07) to the enclosure surface, and connect it to the inverter.
Use the option FR-CB2
, or the following connector and cable available on the market.
Securely insert one end of connection cable into the PU connector of the inverter and the other end into the
connection connector of the operation panel (FR-DU07) along the guides until the stoppers are fixed.
for RS-485 communication.
REMARKS
· Overall wiring length when the operation panel is connected: 20m(65.6 feet)
· Refer to the following when fabricating the cable on the user side.
Commercially available product examples
(as of Oct. 2008)
Parameter unit connection cable
(FR-CB2
)(option)
Operation panel(FR-DU07)
Operation panel connection connector
(FR-ADP)(option)
* Do not use pins No. 2, 8 of the communication cable.
Product
Type
Maker
1) Communication cable
SGLPEV-T (Cat5e/300m)
24AWG × 4P*
Mitsubishi Cable Industries, Ltd.
2) RJ-45 connector
5-554720-3
Tyco Electronics Corporation
Содержание 700 Series
Страница 11: ...MEMO ...
Страница 23: ...12 MEMO ...
Страница 341: ...330 MEMO ...
Страница 365: ...354 MEMO ...
Страница 379: ...368 MEMO ...
Страница 397: ...386 MEMO ...
Страница 414: ...403 MEMO ...