Mitsubishi Daiya SRC25GZ-L1 Скачать руководство пользователя страница 16

16

SRK-GZ

1.4

OUTLINE OF OPERATION CONTROL BY MICROCOMPUTER

(1)

Remote control switch

Indoor unit indicator

FAN SPEED

ON/OFF

MODE

TEMP

AIR FLOW

SET TIMER

TIMER

ACL

HI POWER

ECONO

CONT HI POWER  ECONO

ON OFF TIMER

AUTO

HI

MED

LO

FAN SPEED indicator

Indicators the 

¡

 for the fan speed which has

been set.

ON-TIMER • OFF-TIMER indicator

FAN SPEED button

Each time the button is pushed, the 

¡

indicator is switched over in turn.

HI POWER button

This button changes the HI POWER
operation.

SET TEMPERATURE  button

This button sets the room temperature.

ECONOMY button

This button changes the ECONOMY operation.

SET TIMER button

This button sets the ON TIMER time or SLEEP
time.

¡

Above figure shows all indications for the
purpose of explanation, but practically only
the pertinent parts are indicated.

HI POWER operation indicator

Indicators during HI POWER operation.

ECONOMY operation indicator

Indicators during ECONOMY operation.

Operation switch over indicator

Indicators the 

¡

 for the operation which has

been set.

AIR FLOW indicator

Indicates selected flap mode.

OPERATION MODE select button

Each time the button is pushed, the 

¡

indicator is switched over in turn.

ON/OFF button

This button, when pressed, starts operation
and stops when repressed.

AIR FLOW button

This button changes the flap mode.

TIMER button

The button selects ON TIMER operation,
OFF-TIMER operation or normal operation.

Reset switch

Switch for resetting microcomputer.

RUN

TIMER

SRK25GZ

INVERTER

RUN (HOT KEEP) lamp (green)

¡

Illuminates during operation.

¡

Flashes at stop blowing due to the hot keep.

TIMER lamp (yellow)

Illuminates during TIMER operation.

Models

All models

Model SRK25GZ-L1

Remote control switch

Содержание SRC25GZ-L1

Страница 1: ...1 SRK GZ 1 WALL MOUNTED TYPE ROOM AIR CONDITIONER Split system Air to air heat pump type SRK25GZ L1 SRK35GZ L1 SRK502Z L 1 SRK GZ...

Страница 2: ...3 1 Electrical wiring 12 1 4 OUTLINE OF OPERATION CONTROL BY MICROCOMPUTER 16 1 5 APPLICATION DATA 30 1 5 1 Selection of location for installation 31 1 5 2 Installation of indoor unit 32 1 5 3 Instal...

Страница 3: ...control after the unit has stabilized 2 Fuzzy control Fuzzy control calculates the amount of variation in the difference between the suction air temperature and the setting tem perature in compliance...

Страница 4: ...roller Room temperature control MC Thermostat Pilot lamp RUN Green TIMER Yellow Safety equipment O D mm in Liquid line 6 35 1 4 Gas line 9 52 3 8 Connecting method Flare connecting Attached length of...

Страница 5: ...equipment O D mm in Liquid line 6 35 1 4 Gas line 12 7 1 2 Connecting method Flare connecting Attached length of piping Liquid line 0 4 m Gas line 0 35 m Insulation Necessary Both sides Drain hose Con...

Страница 6: ...Green Safety equipment O D mm in Liquid line 6 35 1 4 Gas line 12 7 1 2 Connecting method Flare connecting Attached length of piping Liquid line 0 4 m Gas line 0 35 m Insulation Necessary Both sides...

Страница 7: ...rature conditions however excludes the initial pull down stage Note The chart is the result from the continuous operation un der constant air temperature conditions however ex cludes the initial pull...

Страница 8: ...5 19 9 236 5 4 5 36 117 40 37 36 56 9 49 A 790 15 67 51 60 62 18 16 780 VIEW A 15 760 170 450 170 Room temp thermistor Terminal block Piping for Gas 12 7 390 Piping for Liquid 6 35 440 Drain hose 600...

Страница 9: ...82 5 61 5 2 12 Terminal block 127 7 33 3 40 40 645 Drain holes Service valve Gas Flare connecting 9 52 3 8 Service valve Liquid Flare connecting 6 35 1 4 50 12 42 13 5 274 5 300 12 23 44 245 540 100...

Страница 10: ...23 14 93 44 142 5 510 33 142 5 40 32 115 45 45 Service Valve Liquid Flare connecting 6 35 1 4 Service Valve Gas Flare connecting 12 7 1 2 Terminal block Drain holes 542 539 413 65 15 300 272 14 58 44...

Страница 11: ...r temp thermistor Compressor Accumulator Discharge Heat exchanger thermistor Cooling cycle Heating cycle Indoor unit Outdoor unit Outdoor unit Indoor unit Room temp thermistor Heat exchanger Flare con...

Страница 12: ...Room temp thermistor 20S 4 way valve coil FMI Fan motor Indoor Th2 Heat exchanger thermistor Indoor unit 52C Magnetic contactor FMO Fan motor Outdoor Th3 Humidity thermistor DS Diode stack NF Noise f...

Страница 13: ...line BK 1 2 3 4 WH 3 2 1 3 2 1 Back up switch Power transistor Y WH RD Y GN WH BK RD WH GY RD WH BK Y GN Y GN LB BR Black Blue Brown Light blue Yellow Red Gray White Violet Yellow Green F2 15A NK NK...

Страница 14: ...er source Signal line BK 1 2 3 4 WH 3 2 1 3 2 1 Back up switch Power transistor Display CND Wireless R Amp Y WH RD Y GN WH BK RD WH GY RD WH BK Y GN Y GN LB BR Black Blue Brown Light blue Yellow Red G...

Страница 15: ...board Printed circuit board Printed circuit board Power transistor Fuse 250V 25A WH Y BL Y GN LB BR RD WH BK RD CNB CNB GY BL CNA CNE DS IC2 RL CNA WH RD WH BK U V W P N OR RE WH BK 52C 4 52C 3 52C F...

Страница 16: ...but practically only the pertinent parts are indicated HI POWER operation indicator Indicators during HI POWER operation ECONOMY operation indicator Indicators during ECONOMY operation Operation switc...

Страница 17: ...button ON OFF button ON OFF Model SRK25GZ L1 Model SRK35GZ L1 TIMER RUN SRK35GZ RUN HOT KEEP lamp green Illuminates during operation Flashing at stop blowing due to the hot keep TIMER lamp yellow Ill...

Страница 18: ...downward directions continuously Horizontal blowing ii When not operating The flap returns to the position of air flow directly below when operation has stopped b Memory flap Excepted SRK 25 model Whi...

Страница 19: ...sensor Th1 2 This function does not actuate when the operation select switch is set at the dehumidifying as well as the dehumidifying in the auto mode However the operation of item 1 above is perform...

Страница 20: ...al mode Normal heating operation operation after HI POWER completion Values of A B A B At 0 Hz command 22 25 Other than 0 Hz 17 19 command Indoor heat exchanger temp C 1st speed 2nd speed 3rd speed 4t...

Страница 21: ...ation after end of defrosting 100 sec Defrosting operation Defrost ON operation 80 sec Fuzzy calculation value Outdoor fan Inverter command frequency Operation lamp Depending on frequency 4 way valve...

Страница 22: ...requency turned to 0 Hz during heating operation 2 When the temperature detected with the external temperature sensor is below 2 C 2 Detail Low voltage is applied to the compressor from the inverter s...

Страница 23: ...34 44Hz 34 44Hz 18 44rps Air flow 3 4th speed 3rd speed 3 4th speed ii When any protective function actuates the operation is performed in the mode corresponding to the function iii Outdoor blower is...

Страница 24: ...RK25 35GZ L1 1 0 Room temperature Setting temperature deg 2 High Low 55 70 100 Operation range Relative humidity I C B A F E D 55 70 Relative humidity Humidity sensor setting range High humidity range...

Страница 25: ...fying After interrupting the compressor operation for 3 minutes by the 3 minute timer following the determination of heating oriented dehumidifying the unit enters in the heating operation If the room...

Страница 26: ...1 step 2 Taking the upper limit of control frequency range at 25 35 60 Hz 50 70 rps if the output frequency obtained with the fuzzy calculation exceeds the upper limit the upper limit value is maintai...

Страница 27: ...ing at the same time iii Reset conditions When the external temperature thermistor temperature drops below 40 C h Freezing cycle system protective control i Operating conditions When both of following...

Страница 28: ...urns to 0 Hz When 0 Hz is commanded from the indoor unit controller when an outdoor protective function is actuated ii Detail of operation S SRK25GZ L1 35GZ L1 ON OFF ON OFF 10 sec 10 sec Notes 1 When...

Страница 29: ...tion Heating heating Cooling cooling Heating heating Cooling cooling oriented dehumidifying oriented dehumidifying oriented dehumidifying oriented dehumidifying Stop Full stop Stop Full stop Stop Rest...

Страница 30: ...lu sive use circuits are used Insufficient power source circuit capacity and defective installment execution can be the cause of electric shocks and fires Accurately connect wiring using the proper ca...

Страница 31: ...ce to the neighborhood f A place where servicing space can be secured 4 cm 5 cm 10 cm 1 5 cm Left side Right side r h Air inlet Service space Air inlet Air Outlet Note 1 If the wall is higher than 1 2...

Страница 32: ...ews in a temporary tightened state Adjust so that board will be level by turning the board with the stan dard hole as the center Fixing on concrete wall Use of nut anchor Use of bolt anchor Note 1 Dri...

Страница 33: ...Install lid b Protective taping Protect the cable with tape at the section where the cable passes through the hole opened on the wall c Forming of pipe Holding down the pipe at the root change the pi...

Страница 34: ...Drain elbow should not be used where days when temperature drops below 0 C continue for several days Draining may be disturbed by frozen water d When installing the unit at a higher place or where it...

Страница 35: ...After completing vacuum operation fully open service valve Both gas and liquid sides with hexagon headed wrench e Check for possible leakage of gas in the connection parts of both indoor and outdoor...

Страница 36: ...ver when the power source is cut off or when the unit s operation switch is turned off or was turned to fan operation position the unit will not go into operation in order to protect the compressor 3...

Страница 37: ...may be more or less depending on the installation 3 The coverage may be less or even nil If the sens ing element is exposed to strong light such as direct sunlight illumination etc or dust is deposite...

Страница 38: ...ur again Temporarily turn off the power source and turn it on again in about 1 min and turn the unit on again YES No YES YES Does the trouble occur again Disconnect connectors and connect them again O...

Страница 39: ...rance thermistor temperature of 50 C or un der continued for more than 3 seconds while operation is stopped This is not displayed during operation When outdoor revolution speed of 0 rps continued for...

Страница 40: ...eat ex changer temperature outdoor unit heat exchanger temperature external tem perature Discharge pipe Comp dome thermistor temperature char acteristics Temperature C Shortcircuit Broken wire Resista...

Страница 41: ...or Broken power transistor broken compressor wire Current safe stop Overload operation compressor lock overcharge Compressor overheat Gas shortage defective discharge pipe Comp dome thermistor Secure...

Страница 42: ...n 1 2 on the outdoor side terminal block Defective indoor unit PCB Check crossover wires Is there any problem on the power supply line fuse reactor capacitor etc Replace fuse reactor or capacitor Defe...

Страница 43: ...l YES Again pushing operating switch Operating the unit NO Does backup switch operates Operating the unit NO NO YES YES Remote controller defects Abnormality is not found a Press the reset switch of t...

Страница 44: ...fuse 3 15A blown Indoor electrical equipment are normal Is voltage applied between CNC 1 2 at transformer s secondary side Approx 12V Is voltage applied between terminals 1 2 on terminal block 220 24...

Страница 45: ...transistor Including power transistor mark Tester probe Black BK BR Y RD V WH Y GN Operation Cooling HI POWER Cooling Rating Heating HI POWER Heating Rating Note 1 The output voltage are reference val...

Страница 46: ...transistor Including power transistor mark Tester probe Black BK BR Y RD V WH Y GN Operation Cooling HI POWER Cooling Rating Heating HI POWER Heating Rating Note 1 The output voltage are reference val...

Страница 47: ...parts in the control box for 5 minutes after the unit is stopped 1 2 3 Y GN Y GN S IN RD WH BK R IN G CNB CNB RL GY DS IC2 P RD U WH BK Tho A Tho R CND CNC CNA CNE CNA Tho D V W N BL AC S AC R S OUT 5...

Страница 48: ...ose A Firstly loose the connecting portion of the charge hose A at the gauge manihold side and open the valve 3 for a few seconds and then immediately retighten it after observing that gas is blow out...

Страница 49: ...MA165 to Remote part on the PCB in the direction as shown in the diagram below This diagram shows SRK25GZ L1 and although the other units have different layout on the PCB their concepts are some Powe...

Страница 50: ...50 SRK GZ MEMO...

Отзывы: