7
Mold and Water Connections
Opening of The Outer Casing for Maintenance
Figure 2
Water Inlet
Water Outlet
Mold connection pipes are installed in the inlet-outlet pipes on the device as shown in Figure 1.
Then the other ends of the hoses are attached to the mold. After that valves behind the device
are opened and hose connections are completed for the first start-up.
Cooling water connections of the device are shown in Figure 2. Water from the water tower
or chiller must be connected to the cooling water inlet. Cooling water outlet should also be
connected to the return line of the water tower or chiller.
To remove the top cover of the device,
lift it up as shown in the picture.
To remove the side covers of the device,
pull it as shown.
To reach the parts in the electrical panel
of the device, unscrew the thumbscrews
shown in the picture and tilt it forward as
shown in the picture.
Figure 1
5 Thumbscrew
Before interfere the devices, the pressure should be reduced and the energy should be cut off.
Содержание TRG-BS-12
Страница 1: ...Thermoregulator Water Type User Manual ...
Страница 11: ...6 Power Connection ...
Страница 16: ...11 CERTIFICATES ...
Страница 17: ...12 ...
Страница 19: ...Today 135 points in the world ...