![Mirolin Riverdale RBF516L Скачать руководство пользователя страница 3](http://html1.mh-extra.com/html/mirolin/riverdale-rbf516l/riverdale-rbf516l_installation-instructions-manual_1806099003.webp)
FIGURE 1
-
FRAME LAYOUT DIMENSIONS
GENERAL INSTALLATION NOTES
Note:
Dimensions are clear openings. Refer to
specification sheet for dimensions of tub shower unit.
"
The Tub Shower is to fit into formed recess as shown in
Figure 1.
"
Clear opening is required with the flange outside of the
opening: 57 ½” x 88 ½” (1461 mm x 2248 mm).
"
Rough - in dimensions: 60”x 90” (1524 mm x 2286
mm).
"
Framing: Inside dimension of the studded alcove are
to be as specified in Figure 1.
"
Follow Figure 2 as specified to ensure width is 57 ½”
between the 2” x 2” recessed studs. (See detail view.)
Shimming May Be Required
"
The unit will rest on the front edge and three feet at the
rear of the unit. Shims may be required to level the tub
to ensure adequate drainage.
"
The shower is fastened in place using dry wall screws.
"
Holes are to be drilled in the flange on both sides and
across the top. The holes are to be drilled by the
installer, installation is illustrated in figure 3.
PREPARATION
"
Build solid framing to the dimensions in Figure 1.
"
Ensure that the floor is level, correct if necessary.
"
The drain location on the tub shower is shown but
actual installation will depend on which waste/
overflow is purchased.
"
Drain pipe must be vertical.
"
Trim drain pipe as required to meet drain assembly.
RBF516L/R - SOAKER
INSTALLATION INSTRUCTIONS AND OWNER’S MANUAL
READ ALL INSTRUCTIONS CAREFULLY BEFORE STARTING THE INSTALLATION
PLEASE RECORD THE SERIAL NUMBER _________ OF YOUR TUB SHOWER
SAVE THIS MANUAL FOR FUTURE REFERENCE
32 ½”
825 mm
8 ½”
215 mm
17
½”
445 mm
©
Mirolin Ind.
Copyright includes all content included in this document
90"
2286 mm
88
½
"
2248 mm
57
½"
1461 mm
60
½"
1537 mm
3/16" Drill Bit
Tools Required
Level
Tape Measure
Electric Drill
Caulking Gun
Hole Saw
Materials Required
Shims
Shimming may
be required
Mildew Resistant
Silicone Bathroom
Caulking
Drywall Screws
Min 40 Pcs
3
Important:
The Acrylic Tub Shower was carefully
inspected and packed for shipment. Ensure the unit is free
of any damage, and if any issues are found do not proceed
with the install and contact Mirolin. The warranty does not
cover damages or defects in the finish once the unit has
been installed.
Protect the tub shower from dirt and damage by leaving
the polyethylene protective film in place until installation
and other related construction is complete.
Consult Local Plumbing and Building Codes Prior to
Installation.
Framing
Note: Do not build the surrounding structure before
receiving your unit. Structure measurements should be
verified against the unit to ensure a proper fit.