background image

4

The company reserves the right to change models and specifications without notice.

We want you to be completely satisfied with our products and service. If you have any comments or

suggestions, please call

toll free.

1-800-MIROLIN

STEP 8: Finish the installation by running a bead of high
quality silicone around the outside of the bathtub, where
the bathroom floor meets the bathtub apron.

STEP 7: Lift the tub back into the correct position,
levelling the tub if necessary (tub levelled at factory).
Level by loosening the hex nut and threading the rod into
or out of the block. Tighten the hex nut against the wood
block once the foot is level. Connect the plumbing once
the tub is level.

HEX NUT

ROD

R0084013

05 Jan. 2016

INSTALLATION NOTES

TESTING

Test the installation after completing the plumbing, but before enclosing the bath and finishing the surroundings.
Fill the bath with water and leave it for one hour to ensure that the adjustment of the drain-overflow assembly is correct, and
that there are no leaks.
Mirolin Industries Corp. will not be liable for any kind of damages as a result of not water testing the unit prior to use by end
user.

Mirolin Industries Corp. is not responsible for any damages incurred as a result of poor installation of the product.

Содержание BEACON 1

Страница 1: ...IROLIN Mirolin Please Do Not Contact Retailer Copyright Mirolin Industries corp 2011 Copyright includes all content included in this document baths for this generation and the next Mirolin Industries...

Страница 2: ...stomer Care is available 8am to 6pm EST Monday to Friday Call Mirolin Customer Care at 800 MIROLIN 647 6546 Email Mirolin Customer Care at support mirolin com mirolin com Your User Friendly On line Mi...

Страница 3: ...section as shown STEP 2 Position the tub in the area where it will be installed Unscrew the drain pop up and mark drain location MARK DRAIN LOCATION STEP 6 ssemble bathing well with apron Rea ensurin...

Страница 4: ...threading the rod into or out of the block Tighten the hex nut against the wood block once the foot is level Connect the plumbing once the tub is level HEX NUT ROD R0084013 05 Jan 2016 INSTALLATION N...

Страница 5: ...N 1 Pour TOUTES les demandes concernant l installation et les produits veuillez contacter le service la client le de Mirolin au 800 MIROLIN Ne pas vous adresser au revendeur MANUEL D UTILISATION Lire...

Страница 6: ...undi au vendredi Appelez le Service la client le de Mirolin au 800 MIROLIN 647 6546 crivez par courrier lectronique au Service la client le de Mirolin support mirolin com mirolin com Votre Centre de R...

Страница 7: ...onnez la baignoire l endroit o elle doit tre install e D vissez le clapet du drain et marquez le positionnement du drain tape 6 R assemblez l int rieur de la baignoire et la jupe en vous assurant que...

Страница 8: ...en rel chant l crou hexagonal et en vissant la tige vers le haut ou le bas dans le bloc Resserrez l crou hexagonal contre le bloc de bois quand le pied est de niveau Raccordez la plomberie quand la b...

Отзывы: