![Mirage IVEH121A Скачать руководство пользователя страница 60](http://html1.mh-extra.com/html/mirage/iveh121a/iveh121a_owners-manual_1805332060.webp)
60
Test Run
BEFORE TEST RUN
TEST RUN INSTRUCTIONS
Only perform test run after you have
completed the following steps:
• Electrical Safety Checks - Confirm
that the unit’s electrical system is safe
and operating properly.
• Gas Leak Checks - Check all fare nut
connections and confirm that the sys-
tem is not leaking.
• Confirm that gas and liquid (high and
low pressure) valves are fully open.
You should perform the Test Run for at
least 30 minutes.
1
. Connect power to the unit.
2.
Press the ON/OFF button on the re-
mote controller to turn it on.
3.
Press the MODE button to scroll
through the following functions, one at a
time:
• COOL - Select lowest possible
temperature
• HEAT - Select highest possible
temperature
4.
Let each function run for 5 minutes, and
perform the following checks:
Содержание IVEH121A
Страница 6: ...6 Unit Specifications and Features Unit Parts...
Страница 16: ...16 Troubleshooting When troubles occur please check the following points before contacting a repair company...
Страница 31: ...31 INSTALLATION...
Страница 35: ...35 Owner s Installation manual...
Страница 36: ...36 Installation Summary Indoor Unit...
Страница 37: ...37...
Страница 62: ...6700 Gateway Park Dr Unit 6 San Diego CA 92154 Ph 619 426 0033 mirageappliances us...