![Mira BSDM Скачать руководство пользователя страница 18](http://html1.mh-extra.com/html/mira/bsdm/bsdm_installation-and-user-manual_1804990018.webp)
18
Power Supply Unit
►
Warning!
Turn off the electrical and water supplies before proceeding with the
installation of the Power Supply Unit (PSU). The electricity must be turned off
at the mains and the appropriate circuit fuse removed, if applicable.
►
The Power Supply Unit (PSU) can be installed a maximum of 1.5 metres away
from the Digital Mixer. A cable from the PSU connects to the Digital Mixer. The
PSU must be connected to a 3 amp switched fused spur box. The spur box
can be positioned a maximum distance of 3 metres away from the PSU.
►
For the Pumped Digital Mixer it is recommended that both Power Supply
cables from the Digital Mixer are connected to the 3 amp switched fuse spur
box via a separate junction box (not supplied). Refer to section:
‘Installation,
Installation Schematic’
.
►
Put the PSU in the required position and mark the positions of the fixing holes.
Drill and plug the fixing holes.
►
Note!
Installers may wish to obtain alternative proprietary cavity fixings, when
installing onto a dry lined, stud partition, shower cubicle or laminated panel
wall structures. However, these methods of fixing are beyond the scope of
this guide.
►
Secure the PSU in position with the fixing screws (supplied).
1.5 m Cable
3.0 m Cable
Junction Box (for Pumped
Version, not supplied)
Cable (for Pumped Version)
3 Amp Switched
Fused Spur Box
Fixing Screws (2 off)