
7. Usage
MiR Shelf Lift Operating guide (en) 12/2019 - v.1.0 ©Copyright 2019: Mobile Industrial Robots A/S.
56
7.
Select the VL-markers entry position, and place the position directly in the same
coordinates on the map as the entry position of the shelf position.
8.
Go to
Setup > Missions
and create a new mission.
9.
Give the mission a name, for example
Place shelf at VL marker
. Select the group and site
you want it to belong to. Select
Create mission
.
10.
Select the following actions:
a.
In the
Move
menu, select
Docking
.
b.
In the
Shelf
menu, select the
Place MiR500/1000 Shelf
template mission.
The mission dialog should look like this:
The following steps describe which parameters each action should be set to. To modify
the parameters, select the gearwheel
of the action in question to open the dialog of
that action.