7. Getting started
MiR500 EU Pallet Lift Quick Start (en) 12/2020 - v.1.1 ©Copyright 2018-2020: Mobile Industrial Robots A/S.
42
2.
Under
MiR internal I/Os
, complete the following sequence, and verify that the robot
executes the expected action:
a.
Under
Outputs
, select
0
, and wait for clicking sounds. This is the initialization of
the calibration process.
b.
Under
Outputs
, select
3
. Verify that the lift rises.
c.
Once the lift is raised, verify that
3
under
Inputs
is green.
d.
Under
Outputs
, select
2
. Verify that the lift lowers.
Содержание 500 EU Pallet Lift
Страница 1: ...Quick Start en Date 12 2020 Revision v 1 1...