11
2 First Operation
2.1
Instruction
Only persons trained by qualified Minuteman
technicians are authorized to operate,
service and repair the machine. Operators
must read and understand this manual
before operating or maintaining this
machine.
2.2 Initial charging procedure
2.3
Before Putting into Operation
Complete the following inspections before
taking the machine into operation:
1. Check the area around the machine for
signs of leakage. Hoses, lines and tanks
must be free from any leakage or dam-
age.
2. Install brushes and squeegee, see
maintenance chapter.
1. Install batteries and connect battery plug,
see maintenance chapter.
2. Check battery charge and recharge bat-
teries if required. An initial charge before
first operation is required.
3. Empty recovery tank and clean it if re-
quired, see maintenance chapter.
4. Re-fill solution tank and add cleaning
agent according to the manufacturer’s
recommendations.
Before first operation of the machine,
fully charge the battery with an initial
charging procedure and comply with
the operating instructions of the
charger as well as with those of the
battery manufacturer. Minuteman
cannot be held liable for damages
resulting from an insufficient initial
charge.
Use only cleaning agents suitable
for automatic machines (low-
foaming) and comply with the
instructions for use, disposal and
with the warning information
specified by the cleaning agent’s
manufacturer.
2.4
Start Machine
Proceed with the following to set the
machine to operating mode:
•
Disconnect mains plug of the charger from
outlet and fasten to holder.
•
Switch on machine by actuation of key
switch from position (0) to position (1).
First Operation
Содержание E24
Страница 1: ...User Manual E24 Walk Behind Scrubber ...
Страница 4: ...4 ...
Страница 38: ...38 Maintenance and Care Fig 13 ...
Страница 40: ...40 ...